Skip to content
All BC permit guides

District of Stewart

How to get a building permit in Stewart, BC

Where to apply, what Stewart asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.

Where to apply in Stewart

In person / email. Submit the completed Building Permit Application Form by email (clerk@districtofstewart.com or cao@districtofstewart.com) or in person at 705 Brightwell Street. Permit is picked up at the District office after CAO approval. No online portal.

Official District of Stewart permit page

District of Stewart, 705 Brightwell St, Stewart, BC. Admin/Finance (250) 636-2251; Public Works (250) 636-9123; Fax (250) 636-2417. Email clerk@districtofstewart.com or cao@districtofstewart.com. Hours Mon–Fri 8:30am–4:30pm.

Who issues electrical and gas permits

Technical Safety BC (province). Not specified on the District page but standard for BC — the District has no delegated electrical/gas authority, so electrical and gas-fitting permits go through Technical Safety BC.

electrical
Technical Safety BC
gas
Technical Safety BC

Step by step in Stewart

  1. 1

    Confirm zoning before anything else

    Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Stewart won't issue until land use is settled.

  2. 2

    Work out which permits you need

    Structural work needs a building permit from District of Stewart. Electrical and gas are separate and are issued by Technical Safety BC (province). Plumbing is usually part of the building permit.

  3. 3

    Prepare drawings and documents

    District of Stewart asks for: Step 1: Review zoning requirements in Zoning Bylaw 881, 2014; Step 2: Read Building Bylaw 843, 2010 and complete the Building Permit Application Form; Step 3: Submit form by email or in person at 705 Brightwell Street; Step 4: Pick up approved permit at the District office after CAO approval; BC Building Code, BC Plumbing Code and BC Fire Code apply (updated regs effective Dec 20, 2012).

  4. 4

    Submit your application

    In person / email. Submit the completed Building Permit Application Form by email (clerk@districtofstewart.com or cao@districtofstewart.com) or in person at 705 Brightwell Street. Permit is picked up at the District office after CAO approval. No online portal.

  5. 5

    Pay the permit fee

    Not published online — set under Building Bylaw 843, 2010. Confirm with the District office (typically value-of-construction based). Confidence: partial on fees. Confirm the current schedule with Stewart before you budget.

  6. 6

    Plan review, then build to inspections

    The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.

What Stewart asks for

  • Step 1: Review zoning requirements in Zoning Bylaw 881, 2014
  • Step 2: Read Building Bylaw 843, 2010 and complete the Building Permit Application Form
  • Step 3: Submit form by email or in person at 705 Brightwell Street
  • Step 4: Pick up approved permit at the District office after CAO approval
  • BC Building Code, BC Plumbing Code and BC Fire Code apply (updated regs effective Dec 20, 2012)

Permit fees in Stewart

Not published online — set under Building Bylaw 843, 2010. Confirm with the District office (typically value-of-construction based). Confidence: partial on fees.

Fees change and vary by project — confirm the current schedule with District of Stewart.

Worth knowing about Stewart

Small remote district near the Alaska border; CAO signs off on permits. Read both Bylaw 843 (building) and Bylaw 881 (zoning) before applying. Fee schedule not online.

Stewart permit questions

Where do I submit a building permit application in Stewart?

In person / email. Submit the completed Building Permit Application Form by email (clerk@districtofstewart.com or cao@districtofstewart.com) or in person at 705 Brightwell Street. Permit is picked up at the District office after CAO approval. No online portal.

Who issues electrical and gas permits in Stewart?

Technical Safety BC (province). Not specified on the District page but standard for BC — the District has no delegated electrical/gas authority, so electrical and gas-fitting permits go through Technical Safety BC.

How much does a building permit cost in Stewart?

Not published online — set under Building Bylaw 843, 2010. Confirm with the District office (typically value-of-construction based). Confidence: partial on fees. Fees vary by project, so confirm the current schedule with District of Stewart before budgeting.

What do I need to apply for a building permit in Stewart?

District of Stewart asks for: Step 1: Review zoning requirements in Zoning Bylaw 881, 2014; Step 2: Read Building Bylaw 843, 2010 and complete the Building Permit Application Form; Step 3: Submit form by email or in person at 705 Brightwell Street; Step 4: Pick up approved permit at the District office after CAO approval; BC Building Code, BC Plumbing Code and BC Fire Code apply (updated regs effective Dec 20, 2012).

Anything else to know about permits in Stewart?

Small remote district near the Alaska border; CAO signs off on permits. Read both Bylaw 843 (building) and Bylaw 881 (zoning) before applying. Fee schedule not online.

Sources

General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with District of Stewart before you build.

See what's being built in Stewart

Construction Radar turns building-permit data into a live map of real construction jobs — who's building, what it's worth, and who to call.

Start for free