Skip to content
All BC permit guides

City of Revelstoke

How to get a building permit in Revelstoke, BC

Where to apply, what Revelstoke asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.

Where to apply in Revelstoke

In person / email — no online portal named. Applications are paper/PDF-based; submit and inquire via building@revelstoke.ca or (250) 837-3637. Building Services main page: https://revelstoke.ca/170/Building-Services.

Official City of Revelstoke permit page

Building Services: building@revelstoke.ca; (250) 837-3637. City Hall: 216 Mackenzie Avenue, Revelstoke, BC V0E 2S0.

Who issues electrical and gas permits

Technical Safety BC (EXPLICITLY STATED by the City) — Revelstoke does NOT issue electrical or gas permits; apply to Technical Safety BC at (866) 566-7233. (Septic approvals go to Interior Health, 250-833-4106.)

electrical
Technical Safety BC
gas
Technical Safety BC

Step by step in Revelstoke

  1. 1

    Confirm zoning before anything else

    Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Revelstoke won't issue until land use is settled.

  2. 2

    Work out which permits you need

    Structural work needs a building permit from City of Revelstoke. Electrical and gas are separate and are issued by Technical Safety BC (EXPLICITLY STATED by the City) — Revelstoke does NOT issue electrical or gas permits; apply to Technical Safety BC at (866) 566-7233. Plumbing is usually part of the building permit.

  3. 3

    Prepare drawings and documents

    City of Revelstoke asks for: Property zoning verified via the City's interactive map; Site plans and drawings (requirements vary by build type); Valuation schedule and plumbing fixture count; Building location certificate; Final permits from utility providers (e.g. Technical Safety BC electrical/gas) before occupancy; BC Energy Step Code compliance for new buildings; Home warranty insurance for new homes; Owner authorization; engineered drawings for complex/structural work.

  4. 4

    Submit your application

    In person / email — no online portal named. Applications are paper/PDF-based; submit and inquire via building@revelstoke.ca or (250) 837-3637. Building Services main page: https://revelstoke.ca/170/Building-Services.

  5. 5

    Pay the permit fee

    Intake fee covers initial application review; final fees due on permit release. Rates set by the City's Fees and Charges Bylaw; different rates apply for mobile/modular homes. Inspection costs included in the permit fees. Confirm the current schedule with Revelstoke before you budget.

  6. 6

    Plan review, then build to inspections

    The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.

What Revelstoke asks for

  • Property zoning verified via the City's interactive map
  • Site plans and drawings (requirements vary by build type)
  • Valuation schedule and plumbing fixture count
  • Building location certificate
  • Final permits from utility providers (e.g. Technical Safety BC electrical/gas) before occupancy
  • BC Energy Step Code compliance for new buildings
  • Home warranty insurance for new homes
  • Owner authorization; engineered drawings for complex/structural work

Permit fees in Revelstoke

Intake fee covers initial application review; final fees due on permit release. Rates set by the City's Fees and Charges Bylaw; different rates apply for mobile/modular homes. Inspection costs included in the permit fees.

Fees change and vary by project — confirm the current schedule with City of Revelstoke.

Worth knowing about Revelstoke

Two-stage fee process (intake fee, then final fee). Review involves Planners, Engineers and the Building Official; Clerks release the permit. Occupancy Permit granted once all inspections pass. Governed by City Bylaw No. 2294.

Revelstoke permit questions

Where do I submit a building permit application in Revelstoke?

In person / email — no online portal named. Applications are paper/PDF-based; submit and inquire via building@revelstoke.ca or (250) 837-3637. Building Services main page: https://revelstoke.ca/170/Building-Services.

Who issues electrical and gas permits in Revelstoke?

Technical Safety BC (EXPLICITLY STATED by the City) — Revelstoke does NOT issue electrical or gas permits; apply to Technical Safety BC at (866) 566-7233. (Septic approvals go to Interior Health, 250-833-4106.)

How much does a building permit cost in Revelstoke?

Intake fee covers initial application review; final fees due on permit release. Rates set by the City's Fees and Charges Bylaw; different rates apply for mobile/modular homes. Inspection costs included in the permit fees. Fees vary by project, so confirm the current schedule with City of Revelstoke before budgeting.

What do I need to apply for a building permit in Revelstoke?

City of Revelstoke asks for: Property zoning verified via the City's interactive map; Site plans and drawings (requirements vary by build type); Valuation schedule and plumbing fixture count; Building location certificate; Final permits from utility providers (e.g. Technical Safety BC electrical/gas) before occupancy; BC Energy Step Code compliance for new buildings; Home warranty insurance for new homes; Owner authorization; engineered drawings for complex/structural work.

Anything else to know about permits in Revelstoke?

Two-stage fee process (intake fee, then final fee). Review involves Planners, Engineers and the Building Official; Clerks release the permit. Occupancy Permit granted once all inspections pass. Governed by City Bylaw No. 2294.

Sources

General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with City of Revelstoke before you build.

See what's being built in Revelstoke

Construction Radar turns building-permit data into a live map of real construction jobs — who's building, what it's worth, and who to call.

Start for free