Village of Port Alice
How to get a building permit in Port Alice, BC
Where to apply, what Port Alice asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.
Where to apply in Port Alice
In person / email — submit the Port Alice Building Permit Application to the Municipal Office (info@portalice.ca); Development Permit applications go to the Approving Officer at the Municipal Office. No online permit portal.
Official Village of Port Alice permit pageVillage of Port Alice Municipal Office, 1061 Marine Drive, Port Alice, BC V0N 2N0 | Phone 250-284-3391 | Fax 250-284-3416 | info@portalice.ca | Hours Mon–Fri 8:30am–4:30pm
Who issues electrical and gas permits
Technical Safety BC issues electrical and gas permits (confirmed in the shared regional Residential Building Permit Guide — electrical permit to install/alter wiring; gas permit to install/alter gas services). The Village issues building/plumbing only.
- electrical
- Technical Safety BC
- gas
- Technical Safety BC
Step by step in Port Alice
- 1
Confirm zoning before anything else
Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Port Alice won't issue until land use is settled.
- 2
Work out which permits you need
Structural work needs a building permit from Village of Port Alice. Electrical and gas are separate and are issued by Technical Safety BC issues electrical and gas permits (confirmed in the shared regional Residential Building Permit Guide — electrical permit to install/alter wiring; gas permit to install/alter gas services). Plumbing is usually part of the building permit.
- 3
Prepare drawings and documents
Village of Port Alice asks for: Regulated by Village Building Bylaw No. 610, 2010 and BC Building Code 2024; permit required before any new build or renovation; Completed Port Alice Building Permit Application signed by owner or representative; Permit needed to construct/alter/add/move/demolish, install/alter plumbing, connect to sewer/storm/water, install chimney/fireplace or wood-burning appliance; Fully detailed scaled plans by building type: site plan, foundation plan, floor plan, cross section (structural details & finishes), elevations of all sides; Engineered/certified plans for manufactured products (trusses, engineered joists, beams); architect/PE drawings for structurally complex work; Electrical permit (Technical Safety BC) for wiring; gas permit (Technical Safety BC) for gas services; Property must be correctly zoned, registered at Land Title Office, and have approved access; Property Assessment Notice + Title Search; survey certificate for new homes; Homeowner Protection Act (home warranty) documents for new-home construction unless exempt; Development Permit required first in OCP-designated DP areas before clearing/building — apply to the Approving Officer; 'Call Before You Dig' for locating propane/cable/sewer/water/storm services; BC Energy Step Code Step 3 applies province-wide (permits on/after May 1, 2023); Variance requests go before the Board of Variance; proof of hardship required.
- 4
Submit your application
In person / email — submit the Port Alice Building Permit Application to the Municipal Office (info@portalice.ca); Development Permit applications go to the Approving Officer at the Municipal Office. No online permit portal.
- 5
Pay the permit fee
Based on total construction value: $175 for value up to $1,000; $8 per $1,000 from $1,001–$100,000; $5.50 per $1,000 from $100,001–$500,000; $4 per $1,000 above $500,000 (per shared regional guide). Confirm the current schedule with Port Alice before you budget.
- 6
Plan review, then build to inspections
The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.
What Port Alice asks for
- Regulated by Village Building Bylaw No. 610, 2010 and BC Building Code 2024; permit required before any new build or renovation
- Completed Port Alice Building Permit Application signed by owner or representative
- Permit needed to construct/alter/add/move/demolish, install/alter plumbing, connect to sewer/storm/water, install chimney/fireplace or wood-burning appliance
- Fully detailed scaled plans by building type: site plan, foundation plan, floor plan, cross section (structural details & finishes), elevations of all sides
- Engineered/certified plans for manufactured products (trusses, engineered joists, beams); architect/PE drawings for structurally complex work
- Electrical permit (Technical Safety BC) for wiring; gas permit (Technical Safety BC) for gas services
- Property must be correctly zoned, registered at Land Title Office, and have approved access; Property Assessment Notice + Title Search; survey certificate for new homes
- Homeowner Protection Act (home warranty) documents for new-home construction unless exempt
- Development Permit required first in OCP-designated DP areas before clearing/building — apply to the Approving Officer
- 'Call Before You Dig' for locating propane/cable/sewer/water/storm services
- BC Energy Step Code Step 3 applies province-wide (permits on/after May 1, 2023)
- Variance requests go before the Board of Variance; proof of hardship required
Permit fees in Port Alice
Based on total construction value: $175 for value up to $1,000; $8 per $1,000 from $1,001–$100,000; $5.50 per $1,000 from $100,001–$500,000; $4 per $1,000 above $500,000 (per shared regional guide).
Fees change and vary by project — confirm the current schedule with Village of Port Alice.
Permit types in Port Alice
Building permit
The core municipal approval to legally construct, add to, or structurally alter a building, issued after plan review confirms compliance with the BC Building Code and local bylaws.
Plumbing permit
A trade permit (often issued separately from, or alongside, the building permit) authorizing installation, extension, or alteration of potable water, drainage-waste-vent, and connections to municipal water/sewer, verified against the BC Plumbing Code.
Worth knowing about Port Alice
Building Bylaw No. 610, 2010. Uses the shared 4-jurisdiction 'Residential Building Permit Guide' (Port Hardy / Port McNeill / Port Alice / Coal Harbour). OCP designates Development Permit areas needing extra approval before building. Main permit info lives on the Town Hall > Planning (Community Plan) page.
Port Alice permit questions
Where do I submit a building permit application in Port Alice?
In person / email — submit the Port Alice Building Permit Application to the Municipal Office (info@portalice.ca); Development Permit applications go to the Approving Officer at the Municipal Office. No online permit portal.
Who issues electrical and gas permits in Port Alice?
Technical Safety BC issues electrical and gas permits (confirmed in the shared regional Residential Building Permit Guide — electrical permit to install/alter wiring; gas permit to install/alter gas services). The Village issues building/plumbing only.
How much does a building permit cost in Port Alice?
Based on total construction value: $175 for value up to $1,000; $8 per $1,000 from $1,001–$100,000; $5.50 per $1,000 from $100,001–$500,000; $4 per $1,000 above $500,000 (per shared regional guide). Fees vary by project, so confirm the current schedule with Village of Port Alice before budgeting.
What do I need to apply for a building permit in Port Alice?
Village of Port Alice asks for: Regulated by Village Building Bylaw No. 610, 2010 and BC Building Code 2024; permit required before any new build or renovation; Completed Port Alice Building Permit Application signed by owner or representative; Permit needed to construct/alter/add/move/demolish, install/alter plumbing, connect to sewer/storm/water, install chimney/fireplace or wood-burning appliance; Fully detailed scaled plans by building type: site plan, foundation plan, floor plan, cross section (structural details & finishes), elevations of all sides; Engineered/certified plans for manufactured products (trusses, engineered joists, beams); architect/PE drawings for structurally complex work; Electrical permit (Technical Safety BC) for wiring; gas permit (Technical Safety BC) for gas services; Property must be correctly zoned, registered at Land Title Office, and have approved access; Property Assessment Notice + Title Search; survey certificate for new homes; Homeowner Protection Act (home warranty) documents for new-home construction unless exempt; Development Permit required first in OCP-designated DP areas before clearing/building — apply to the Approving Officer; 'Call Before You Dig' for locating propane/cable/sewer/water/storm services; BC Energy Step Code Step 3 applies province-wide (permits on/after May 1, 2023); Variance requests go before the Board of Variance; proof of hardship required.
Anything else to know about permits in Port Alice?
Building Bylaw No. 610, 2010. Uses the shared 4-jurisdiction 'Residential Building Permit Guide' (Port Hardy / Port McNeill / Port Alice / Coal Harbour). OCP designates Development Permit areas needing extra approval before building. Main permit info lives on the Town Hall > Planning (Community Plan) page.
Sources
General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with Village of Port Alice before you build.