Skip to content
All BC permit guides

City of Pitt Meadows

How to get a building permit in Pitt Meadows, BC

Where to apply, what Pitt Meadows asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.

Where to apply in Pitt Meadows

No full online APPLICATION portal — building permit application packages are submitted IN PERSON at City Hall or by EMAIL to building@pittmeadows.ca. The City does run 'MyPittMeadows eServices' (a.k.a. MyInspections) at the pittmeadows.ca eServices page for booking/rescheduling/cancelling inspections online (register a profile with email verification).

Official City of Pitt Meadows permit page

Building Department: 604-465-2428; building@pittmeadows.ca. City Hall, 12007 Harris Road, Pitt Meadows, BC V3Y 2B5. Mon–Fri 8:30am–4:30pm.

Who issues electrical and gas permits

Technical Safety BC — the City explicitly states 'The City of Pitt Meadows does not issue gas or electrical permits. You must contact Technical Safety BC for permits and inspections.' Contractors/homeowners apply to TSBC (technicalsafetybc.ca), not the City, for electrical and gas.

electrical
Technical Safety BC
gas
Technical Safety BC

Step by step in Pitt Meadows

  1. 1

    Confirm zoning before anything else

    Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Pitt Meadows won't issue until land use is settled.

  2. 2

    Work out which permits you need

    Structural work needs a building permit from City of Pitt Meadows. Electrical and gas are separate and are issued by Technical Safety BC — the City explicitly states 'The City of Pitt Meadows does not issue gas or electrical permits. Plumbing is usually part of the building permit.

  3. 3

    Prepare drawings and documents

    City of Pitt Meadows asks for: THREE (3) complete, fully detailed sets of plans drawn to scale, with enough detail for a competent person to construct the work; Site plan showing location of existing + proposed buildings with setbacks; location/dimensions of municipal easements, rights-of-way and registered covenants; Floor plans and elevations of proposed buildings; BC Energy Step Code / energy compliance information for applicable new construction; Owner's Acknowledgement of Responsibility and Owner's Acknowledgement of Professional Design and Review forms; Proof of Liability Insurance; Letter of Authorization where an agent applies on the owner's behalf; New-home warranty (BC Housing enrolment or owner-builder exemption) for new residential construction; Schedule B / registered professional Letters of Assurance for engineered / complex work per BC Building Code; Electrical & gas permits obtained separately from Technical Safety BC (proof may be required).

  4. 4

    Submit your application

    No full online APPLICATION portal — building permit application packages are submitted IN PERSON at City Hall or by EMAIL to building@pittmeadows.ca. The City does run 'MyPittMeadows eServices' (a.k.a. MyInspections) at the pittmeadows.ca eServices page for booking/rescheduling/cancelling inspections online (register a profile with email verification).

  5. 5

    Pay the permit fee

    Building permit fees based on the VALUE OF CONSTRUCTION per Building Bylaw No. 2131, 2003, Schedule 1 (current building bylaw referenced as the successor bylaw). Application/plan review fee at submission plus permit fee at issuance; refundable deposits/securities may apply. Confirm the current schedule with Pitt Meadows before you budget.

  6. 6

    Plan review, then build to inspections

    The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.

What Pitt Meadows asks for

  • THREE (3) complete, fully detailed sets of plans drawn to scale, with enough detail for a competent person to construct the work
  • Site plan showing location of existing + proposed buildings with setbacks; location/dimensions of municipal easements, rights-of-way and registered covenants
  • Floor plans and elevations of proposed buildings
  • BC Energy Step Code / energy compliance information for applicable new construction
  • Owner's Acknowledgement of Responsibility and Owner's Acknowledgement of Professional Design and Review forms
  • Proof of Liability Insurance
  • Letter of Authorization where an agent applies on the owner's behalf
  • New-home warranty (BC Housing enrolment or owner-builder exemption) for new residential construction
  • Schedule B / registered professional Letters of Assurance for engineered / complex work per BC Building Code
  • Electrical & gas permits obtained separately from Technical Safety BC (proof may be required)

Permit fees in Pitt Meadows

Building permit fees based on the VALUE OF CONSTRUCTION per Building Bylaw No. 2131, 2003, Schedule 1 (current building bylaw referenced as the successor bylaw). Application/plan review fee at submission plus permit fee at issuance; refundable deposits/securities may apply.

Fees change and vary by project — confirm the current schedule with City of Pitt Meadows.

Worth knowing about Pitt Meadows

Small city — no online submission portal for permits (email/counter only), though inspections are booked online via MyPittMeadows eServices. Electrical and gas go to Technical Safety BC (unlike neighbouring Maple Ridge which self-administers). Development Permit / Development Variance Permit may be required prior to building permit for many parcels.

Pitt Meadows permit questions

Where do I submit a building permit application in Pitt Meadows?

No full online APPLICATION portal — building permit application packages are submitted IN PERSON at City Hall or by EMAIL to building@pittmeadows.ca. The City does run 'MyPittMeadows eServices' (a.k.a. MyInspections) at the pittmeadows.ca eServices page for booking/rescheduling/cancelling inspections online (register a profile with email verification).

Who issues electrical and gas permits in Pitt Meadows?

Technical Safety BC — the City explicitly states 'The City of Pitt Meadows does not issue gas or electrical permits. You must contact Technical Safety BC for permits and inspections.' Contractors/homeowners apply to TSBC (technicalsafetybc.ca), not the City, for electrical and gas.

How much does a building permit cost in Pitt Meadows?

Building permit fees based on the VALUE OF CONSTRUCTION per Building Bylaw No. 2131, 2003, Schedule 1 (current building bylaw referenced as the successor bylaw). Application/plan review fee at submission plus permit fee at issuance; refundable deposits/securities may apply. Fees vary by project, so confirm the current schedule with City of Pitt Meadows before budgeting.

What do I need to apply for a building permit in Pitt Meadows?

City of Pitt Meadows asks for: THREE (3) complete, fully detailed sets of plans drawn to scale, with enough detail for a competent person to construct the work; Site plan showing location of existing + proposed buildings with setbacks; location/dimensions of municipal easements, rights-of-way and registered covenants; Floor plans and elevations of proposed buildings; BC Energy Step Code / energy compliance information for applicable new construction; Owner's Acknowledgement of Responsibility and Owner's Acknowledgement of Professional Design and Review forms; Proof of Liability Insurance; Letter of Authorization where an agent applies on the owner's behalf; New-home warranty (BC Housing enrolment or owner-builder exemption) for new residential construction; Schedule B / registered professional Letters of Assurance for engineered / complex work per BC Building Code; Electrical & gas permits obtained separately from Technical Safety BC (proof may be required).

Anything else to know about permits in Pitt Meadows?

Small city — no online submission portal for permits (email/counter only), though inspections are booked online via MyPittMeadows eServices. Electrical and gas go to Technical Safety BC (unlike neighbouring Maple Ridge which self-administers). Development Permit / Development Variance Permit may be required prior to building permit for many parcels.

Sources

General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with City of Pitt Meadows before you build.

See what's being built in Pitt Meadows

Construction Radar turns building-permit data into a live map of real construction jobs — who's building, what it's worth, and who to call.

Start for free