Skip to content
All BC permit guides

Village of New Denver

How to get a building permit in New Denver, BC

Where to apply, what New Denver asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.

Where to apply in New Denver

In person / email — NO online portal. Building permits are administered by the Regional District of Central Kootenay (RDCK) Building Service. Applications submitted as PDF to buildingdepartment@rdck.bc.ca, or forms downloaded/picked up at RDCK offices. Village Office confirms zoning/OCP compliance first.

Official Village of New Denver permit page

Village of New Denver Office, 115 Slocan Ave (PO Box 40), New Denver BC V0G 1S0, 250-358-2316, office@newdenver.ca. Building permits handled by RDCK Nakusp office: 250-265-4111, nakuspbuilding@rdck.bc.ca (RDCK head office Nelson 250-352-8155, buildingdepartment@rdck.bc.ca).

Who issues electrical and gas permits

Technical Safety BC (issues all electrical and gas permits/inspections; not the Village or RDCK)

electrical
Technical Safety BC
gas
Technical Safety BC

Step by step in New Denver

  1. 1

    Confirm zoning before anything else

    Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — New Denver won't issue until land use is settled.

  2. 2

    Work out which permits you need

    Structural work needs a building permit from Village of New Denver. Electrical and gas are separate and are issued by Technical Safety BC (issues all electrical and gas permits/inspections; not the Village or RDCK). Plumbing is usually part of the building permit.

  3. 3

    Prepare drawings and documents

    Village of New Denver asks for: Any structure over 10 m2 (approx. 107-108 sq ft) requires a permit; Completed RDCK Building Permit Application Form (fillable PDF); Project-specific RDCK checklist (Single Family Dwelling, Accessory Building, Plumbing, Demolition, etc.); Design/construction drawings and plans; Site plan showing location relative to property lines; Construction, Demolition & Renovation Waste Declaration Form; Owner authorization / Owner's Representative sign-off; BC Housing new-home registration (Home Owner Protection) required for new dwellings; BC Energy Step Code compliance for new residential construction; WorkSafeBC / asbestos clearance where demolition or renovation applies; Village Office reviews for Zoning Bylaw No. 612, 2007 and Building Bylaw No. 595/670 compliance before RDCK plan review.

  4. 4

    Submit your application

    In person / email — NO online portal. Building permits are administered by the Regional District of Central Kootenay (RDCK) Building Service. Applications submitted as PDF to buildingdepartment@rdck.bc.ca, or forms downloaded/picked up at RDCK offices. Village Office confirms zoning/OCP compliance first.

  5. 5

    Pay the permit fee

    Plan-check deposit fee per Schedule A, RDCK Building Bylaw No. 2200, 2010 (SFD $100; multi-family/commercial/industrial/institutional $200; accessory building/addition $50); full permit fees per RDCK Fee Schedule Bylaw No. 2383-2014, value-of-construction based. Confirm the current schedule with New Denver before you budget.

  6. 6

    Plan review, then build to inspections

    The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.

What New Denver asks for

  • Any structure over 10 m2 (approx. 107-108 sq ft) requires a permit
  • Completed RDCK Building Permit Application Form (fillable PDF)
  • Project-specific RDCK checklist (Single Family Dwelling, Accessory Building, Plumbing, Demolition, etc.)
  • Design/construction drawings and plans
  • Site plan showing location relative to property lines
  • Construction, Demolition & Renovation Waste Declaration Form
  • Owner authorization / Owner's Representative sign-off
  • BC Housing new-home registration (Home Owner Protection) required for new dwellings
  • BC Energy Step Code compliance for new residential construction
  • WorkSafeBC / asbestos clearance where demolition or renovation applies
  • Village Office reviews for Zoning Bylaw No. 612, 2007 and Building Bylaw No. 595/670 compliance before RDCK plan review

Permit fees in New Denver

Plan-check deposit fee per Schedule A, RDCK Building Bylaw No. 2200, 2010 (SFD $100; multi-family/commercial/industrial/institutional $200; accessory building/addition $50); full permit fees per RDCK Fee Schedule Bylaw No. 2383-2014, value-of-construction based.

Fees change and vary by project — confirm the current schedule with Village of New Denver.

Worth knowing about New Denver

New Denver does NOT run its own building department — building permits, plan review, and inspections are delegated to the RDCK Building Service (Nakusp office serves New Denver, Silverton, Slocan). The Village handles zoning/OCP referral only. Electrical and gas go to Technical Safety BC.

New Denver permit questions

Where do I submit a building permit application in New Denver?

In person / email — NO online portal. Building permits are administered by the Regional District of Central Kootenay (RDCK) Building Service. Applications submitted as PDF to buildingdepartment@rdck.bc.ca, or forms downloaded/picked up at RDCK offices. Village Office confirms zoning/OCP compliance first.

Who issues electrical and gas permits in New Denver?

Technical Safety BC (issues all electrical and gas permits/inspections; not the Village or RDCK)

How much does a building permit cost in New Denver?

Plan-check deposit fee per Schedule A, RDCK Building Bylaw No. 2200, 2010 (SFD $100; multi-family/commercial/industrial/institutional $200; accessory building/addition $50); full permit fees per RDCK Fee Schedule Bylaw No. 2383-2014, value-of-construction based. Fees vary by project, so confirm the current schedule with Village of New Denver before budgeting.

What do I need to apply for a building permit in New Denver?

Village of New Denver asks for: Any structure over 10 m2 (approx. 107-108 sq ft) requires a permit; Completed RDCK Building Permit Application Form (fillable PDF); Project-specific RDCK checklist (Single Family Dwelling, Accessory Building, Plumbing, Demolition, etc.); Design/construction drawings and plans; Site plan showing location relative to property lines; Construction, Demolition & Renovation Waste Declaration Form; Owner authorization / Owner's Representative sign-off; BC Housing new-home registration (Home Owner Protection) required for new dwellings; BC Energy Step Code compliance for new residential construction; WorkSafeBC / asbestos clearance where demolition or renovation applies; Village Office reviews for Zoning Bylaw No. 612, 2007 and Building Bylaw No. 595/670 compliance before RDCK plan review.

Anything else to know about permits in New Denver?

New Denver does NOT run its own building department — building permits, plan review, and inspections are delegated to the RDCK Building Service (Nakusp office serves New Denver, Silverton, Slocan). The Village handles zoning/OCP referral only. Electrical and gas go to Technical Safety BC.

Sources

General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with Village of New Denver before you build.

See what's being built in New Denver

Construction Radar turns building-permit data into a live map of real construction jobs — who's building, what it's worth, and who to call.

Start for free