How to get a building permit in Mission, BC
Where to apply, what Mission asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.
Some details for Mission could not be fully confirmed from published sources. Verify with the city before you rely on them.
Where to apply in Mission
No online building-permit application portal (their public website blocks automated fetches but search-verified content is consistent). Building permit application packages are submitted by EMAIL / IN PERSON. Development applications are emailed to planning@mission.ca for initial review; building enquiries/applications via iservices@mission.ca or building@mission.ca. A Pre-Submission Review step is offered before formal application. (The Province's Building Permit Hub, buildingpermit.gov.bc.ca, is a separate provincial digital-submission system; Mission has not been confirmed as onboarded.)
Official District of Mission (City of Mission) permit pageBuilding Inspection Division: 604-820-3726 (also 604-820-3748); iservices@mission.ca / building@mission.ca; planning@mission.ca for development applications. Welton Common Building, 7337 Welton Street, Mission, BC.
Who issues electrical and gas permits
Technical Safety BC (technicalsafetybc.ca) issues electrical and gas permits for Mission — Mission is NOT among the delegated municipalities that self-administer electrical/gas (unlike Maple Ridge). Contractors/homeowners apply to TSBC for electrical and gas permits and inspections; the City handles building/plumbing.
- electrical
- Technical Safety BC
- gas
- Technical Safety BC
Step by step in Mission
- 1
Confirm zoning before anything else
Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Mission won't issue until land use is settled.
- 2
Work out which permits you need
Structural work needs a building permit from District of Mission (City of Mission). Electrical and gas are separate and are issued by Technical Safety BC (technicalsafetybc. Plumbing is usually part of the building permit.
- 3
Prepare drawings and documents
District of Mission (City of Mission) asks for: Application governed by Building Bylaw 3590-2003; construction must meet the current BC Building Code (2024 BCBC); Complete sets of scaled drawings — site plan, floor plans, elevations, cross-sections (see project-specific Guide/checklist); Site plan showing existing + proposed buildings and setbacks; Energy compliance information for residential: summary of building-envelope, HVAC and service-water-heating characteristics, and annual energy consumption of all energy sources for the proposed house (BC Energy Step Code / Zero Carbon Step Code); Pre-application: contact Planning first for matters under Zoning Bylaw 5949-2020 (a Pre-Submission Review is offered); New-home warranty (BC Housing enrolment or owner-builder exemption) for new dwellings; Owner authorization where an agent applies; Registered-professional Letters of Assurance (Schedule A/B/C) for engineered / complex work; Electrical & gas permits obtained separately from Technical Safety BC.
- 4
Submit your application
No online building-permit application portal (their public website blocks automated fetches but search-verified content is consistent). Building permit application packages are submitted by EMAIL / IN PERSON. Development applications are emailed to planning@mission.ca for initial review; building enquiries/applications via iservices@mission.ca or building@mission.ca. A Pre-Submission Review step is offered before formal application. (The Province's Building Permit Hub, buildingpermit.gov.bc.ca, is a separate provincial digital-submission system; Mission has not been confirmed as onboarded.)
- 5
Pay the permit fee
Non-refundable application fee at submission; building permit fee at issuance based on the VALUE OF CONSTRUCTION; refundable deposits/securities. Fees set in Schedule A of Building Bylaw 3590-2003. Confirm the current schedule with Mission before you budget.
- 6
Plan review, then build to inspections
The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.
What Mission asks for
- Application governed by Building Bylaw 3590-2003; construction must meet the current BC Building Code (2024 BCBC)
- Complete sets of scaled drawings — site plan, floor plans, elevations, cross-sections (see project-specific Guide/checklist)
- Site plan showing existing + proposed buildings and setbacks
- Energy compliance information for residential: summary of building-envelope, HVAC and service-water-heating characteristics, and annual energy consumption of all energy sources for the proposed house (BC Energy Step Code / Zero Carbon Step Code)
- Pre-application: contact Planning first for matters under Zoning Bylaw 5949-2020 (a Pre-Submission Review is offered)
- New-home warranty (BC Housing enrolment or owner-builder exemption) for new dwellings
- Owner authorization where an agent applies
- Registered-professional Letters of Assurance (Schedule A/B/C) for engineered / complex work
- Electrical & gas permits obtained separately from Technical Safety BC
Permit fees in Mission
Non-refundable application fee at submission; building permit fee at issuance based on the VALUE OF CONSTRUCTION; refundable deposits/securities. Fees set in Schedule A of Building Bylaw 3590-2003.
Fees change and vary by project — confirm the current schedule with District of Mission (City of Mission).
Permit types in Mission
Plumbing permit
A trade permit (often issued separately from, or alongside, the building permit) authorizing installation, extension, or alteration of potable water, drainage-waste-vent, and connections to municipal water/sewer, verified against the BC Plumbing Code.
Demolition permit
A municipal permit to tear down or remove a building or structure, conditional on safe utility disconnections, a pre-demolition hazardous-materials (asbestos) survey and abatement, and — in many cities — recycling/deconstruction requirements backed by a refundable deposit.
Worth knowing about Mission
Zoning compliance (Zoning Bylaw 5949-2020) must be confirmed with Planning before a building permit — a Development Permit may be required first for many properties. Pre-Submission Review recommended to reduce delays; the City publishes building-permit WAIT TIMES (mission.ca/wait-times). Email/counter submission only. Electrical/gas go to Technical Safety BC.
Mission permit questions
Where do I submit a building permit application in Mission?
No online building-permit application portal (their public website blocks automated fetches but search-verified content is consistent). Building permit application packages are submitted by EMAIL / IN PERSON. Development applications are emailed to planning@mission.ca for initial review; building enquiries/applications via iservices@mission.ca or building@mission.ca. A Pre-Submission Review step is offered before formal application. (The Province's Building Permit Hub, buildingpermit.gov.bc.ca, is a separate provincial digital-submission system; Mission has not been confirmed as onboarded.)
Who issues electrical and gas permits in Mission?
Technical Safety BC (technicalsafetybc.ca) issues electrical and gas permits for Mission — Mission is NOT among the delegated municipalities that self-administer electrical/gas (unlike Maple Ridge). Contractors/homeowners apply to TSBC for electrical and gas permits and inspections; the City handles building/plumbing.
How much does a building permit cost in Mission?
Non-refundable application fee at submission; building permit fee at issuance based on the VALUE OF CONSTRUCTION; refundable deposits/securities. Fees set in Schedule A of Building Bylaw 3590-2003. Fees vary by project, so confirm the current schedule with District of Mission (City of Mission) before budgeting.
What do I need to apply for a building permit in Mission?
District of Mission (City of Mission) asks for: Application governed by Building Bylaw 3590-2003; construction must meet the current BC Building Code (2024 BCBC); Complete sets of scaled drawings — site plan, floor plans, elevations, cross-sections (see project-specific Guide/checklist); Site plan showing existing + proposed buildings and setbacks; Energy compliance information for residential: summary of building-envelope, HVAC and service-water-heating characteristics, and annual energy consumption of all energy sources for the proposed house (BC Energy Step Code / Zero Carbon Step Code); Pre-application: contact Planning first for matters under Zoning Bylaw 5949-2020 (a Pre-Submission Review is offered); New-home warranty (BC Housing enrolment or owner-builder exemption) for new dwellings; Owner authorization where an agent applies; Registered-professional Letters of Assurance (Schedule A/B/C) for engineered / complex work; Electrical & gas permits obtained separately from Technical Safety BC.
Anything else to know about permits in Mission?
Zoning compliance (Zoning Bylaw 5949-2020) must be confirmed with Planning before a building permit — a Development Permit may be required first for many properties. Pre-Submission Review recommended to reduce delays; the City publishes building-permit WAIT TIMES (mission.ca/wait-times). Email/counter submission only. Electrical/gas go to Technical Safety BC.
Sources
- https://www.mission.ca/building-permits
- https://www.mission.ca/city-hall/departments/development-services/building/regulations-and-forms
- https://www.mission.ca/media/file/building-bylaw-3590-2003pdf
- https://www.mission.ca/building-permits/pre-submission-review
- https://www.mission.ca/media/file/addition-2025
General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with District of Mission (City of Mission) before you build.