Village of Midway
How to get a building permit in Midway, BC
Where to apply, what Midway asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.
Where to apply in Midway
In person / email — building permits are processed by the RDKB (Regional District of Kootenay Boundary) Building Department in Grand Forks. The 'Application for Building Permit' PDF is downloaded from the RDKB/Village site and submitted to the RDKB building office (gfbuilding@rdkb.com, 250-442-2708). Planning items (DP/DVP/Board of Variance) go through the Village office. No online permitting portal.
Official Village of Midway permit pageBuilding permits: RDKB Building Department, 2140 Central Ave, Box 1965, Grand Forks BC V0H 1H0 — phone 250-442-2708, email gfbuilding@rdkb.com. Village of Midway office: phone 250-449-2222, email midwayreception@shaw.ca (Mon–Fri 8:30–12 & 1–4:30).
Who issues electrical and gas permits
Technical Safety BC — explicitly stated on the application: 'Electrical and Gas Permits can be obtained from Technical Safety B.C.' (technicalsafetybc.ca, 1-866-566-7233, contact@technicalsafetybc.ca).
- electrical
- Technical Safety BC
- gas
- Technical Safety BC
Step by step in Midway
- 1
Confirm zoning before anything else
Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Midway won't issue until land use is settled.
- 2
Work out which permits you need
Structural work needs a building permit from Village of Midway. Electrical and gas are separate and are issued by Technical Safety BC — explicitly stated on the application: 'Electrical and Gas Permits can be obtained from Technical Safety B. Plumbing is usually part of the building permit.
- 3
Prepare drawings and documents
Village of Midway asks for: Completed building permit application form; Current Title Search (within last 30 days) with covenants/easements/rights-of-way (fee charged if not provided); Site plan drawn to scale showing proposed construction, distances to property lines, lot dimensions, other buildings and water courses; property lines located/staked (or a Certificate of Location survey); Two sets of scaled construction plans: foundation plan, basement plan, floor plan, 4-elevation views, cross-section, and plumbing schematic (drain/waste/vent + water distribution with pipe sizes and valves); Engineering where required (geotechnical/structural — footings, foundations, framing) per BC Building Code; engineered truss design, floor-joist and beam specs; 'Highway Access Permit' if a building is accessed directly off a highway (MoTI Grand Forks 250-442-4384); New Home Registration / home warranty via BC Housing for all new dwellings; 'Record of Sewerage System' / Interior Health approval where not on community water/sewer; WorkSafeBC asbestos/hazmat inspection recommended for buildings built before 1990.
- 4
Submit your application
In person / email — building permits are processed by the RDKB (Regional District of Kootenay Boundary) Building Department in Grand Forks. The 'Application for Building Permit' PDF is downloaded from the RDKB/Village site and submitted to the RDKB building office (gfbuilding@rdkb.com, 250-442-2708). Planning items (DP/DVP/Board of Variance) go through the Village office. No online permitting portal.
- 5
Pay the permit fee
Fees per Village of Midway Building & Plumbing Bylaw No. 290 (and amendments), administered by RDKB — based on value/cost of construction; additional charge if Title Search not supplied. Confirm the current schedule with Midway before you budget.
- 6
Plan review, then build to inspections
The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.
What Midway asks for
- Completed building permit application form
- Current Title Search (within last 30 days) with covenants/easements/rights-of-way (fee charged if not provided)
- Site plan drawn to scale showing proposed construction, distances to property lines, lot dimensions, other buildings and water courses; property lines located/staked (or a Certificate of Location survey)
- Two sets of scaled construction plans: foundation plan, basement plan, floor plan, 4-elevation views, cross-section, and plumbing schematic (drain/waste/vent + water distribution with pipe sizes and valves)
- Engineering where required (geotechnical/structural — footings, foundations, framing) per BC Building Code; engineered truss design, floor-joist and beam specs
- 'Highway Access Permit' if a building is accessed directly off a highway (MoTI Grand Forks 250-442-4384)
- New Home Registration / home warranty via BC Housing for all new dwellings
- 'Record of Sewerage System' / Interior Health approval where not on community water/sewer
- WorkSafeBC asbestos/hazmat inspection recommended for buildings built before 1990
Permit fees in Midway
Fees per Village of Midway Building & Plumbing Bylaw No. 290 (and amendments), administered by RDKB — based on value/cost of construction; additional charge if Title Search not supplied.
Fees change and vary by project — confirm the current schedule with Village of Midway.
Worth knowing about Midway
Village contracts building inspection to the RDKB Building Department in Grand Forks (same office and application template as Greenwood). Application PDF explicitly routes electrical/gas to Technical Safety BC and lists BC Housing, MoTI Highway Access, Interior Health and WorkSafeBC steps — a good model for the trades guide.
Midway permit questions
Where do I submit a building permit application in Midway?
In person / email — building permits are processed by the RDKB (Regional District of Kootenay Boundary) Building Department in Grand Forks. The 'Application for Building Permit' PDF is downloaded from the RDKB/Village site and submitted to the RDKB building office (gfbuilding@rdkb.com, 250-442-2708). Planning items (DP/DVP/Board of Variance) go through the Village office. No online permitting portal.
Who issues electrical and gas permits in Midway?
Technical Safety BC — explicitly stated on the application: 'Electrical and Gas Permits can be obtained from Technical Safety B.C.' (technicalsafetybc.ca, 1-866-566-7233, contact@technicalsafetybc.ca).
How much does a building permit cost in Midway?
Fees per Village of Midway Building & Plumbing Bylaw No. 290 (and amendments), administered by RDKB — based on value/cost of construction; additional charge if Title Search not supplied. Fees vary by project, so confirm the current schedule with Village of Midway before budgeting.
What do I need to apply for a building permit in Midway?
Village of Midway asks for: Completed building permit application form; Current Title Search (within last 30 days) with covenants/easements/rights-of-way (fee charged if not provided); Site plan drawn to scale showing proposed construction, distances to property lines, lot dimensions, other buildings and water courses; property lines located/staked (or a Certificate of Location survey); Two sets of scaled construction plans: foundation plan, basement plan, floor plan, 4-elevation views, cross-section, and plumbing schematic (drain/waste/vent + water distribution with pipe sizes and valves); Engineering where required (geotechnical/structural — footings, foundations, framing) per BC Building Code; engineered truss design, floor-joist and beam specs; 'Highway Access Permit' if a building is accessed directly off a highway (MoTI Grand Forks 250-442-4384); New Home Registration / home warranty via BC Housing for all new dwellings; 'Record of Sewerage System' / Interior Health approval where not on community water/sewer; WorkSafeBC asbestos/hazmat inspection recommended for buildings built before 1990.
Anything else to know about permits in Midway?
Village contracts building inspection to the RDKB Building Department in Grand Forks (same office and application template as Greenwood). Application PDF explicitly routes electrical/gas to Technical Safety BC and lists BC Housing, MoTI Highway Access, Interior Health and WorkSafeBC steps — a good model for the trades guide.
Sources
General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with Village of Midway before you build.
See what's being built in Midway
Construction Radar turns building-permit data into a live map of real construction jobs — who's building, what it's worth, and who to call.
Start for free