Skip to content
All BC permit guides

Village of Masset

How to get a building permit in Masset, BC

Where to apply, what Masset asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.

Some details for Masset could not be fully confirmed from published sources. Verify with the city before you rely on them.

Where to apply in Masset

In person / email — no online permit portal. Village office handles applications directly. (No dedicated building-permit web page located; Property Services page covers only water/sewer/garbage.)

Official Village of Masset permit page

Village of Masset, PO Box 68, Masset, BC V0T 1M0. Phone 250-626-3995; Fax 250-626-3968. Website massetbc.com (Residents > Property Services / Village Office).

Who issues electrical and gas permits

Technical Safety BC (province). Standard for a village this size — Masset has no delegated electrical/gas authority; electrical and gas-fitting permits go through Technical Safety BC.

electrical
Technical Safety BC
gas
Technical Safety BC

Step by step in Masset

  1. 1

    Confirm zoning before anything else

    Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Masset won't issue until land use is settled.

  2. 2

    Work out which permits you need

    Structural work needs a building permit from Village of Masset. Electrical and gas are separate and are issued by Technical Safety BC (province). Plumbing is usually part of the building permit.

  3. 3

    Prepare drawings and documents

    Village of Masset asks for: Building permits required prior to or concurrently with other approvals; not waived by other approvals; Application, drawings and fees handled through the Village Office (details not published online); Governed by Village building/zoning bylaws and the Integrated Official Community Plan (Masset2040 IOCP); BC Building Code applies.

  4. 4

    Submit your application

    In person / email — no online permit portal. Village office handles applications directly. (No dedicated building-permit web page located; Property Services page covers only water/sewer/garbage.)

  5. 5

    Pay the permit fee

    Not published online — set by Village bylaw; confirm with the Village office. Confidence: partial. Confirm the current schedule with Masset before you budget.

  6. 6

    Plan review, then build to inspections

    The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.

What Masset asks for

  • Building permits required prior to or concurrently with other approvals; not waived by other approvals
  • Application, drawings and fees handled through the Village Office (details not published online)
  • Governed by Village building/zoning bylaws and the Integrated Official Community Plan (Masset2040 IOCP)
  • BC Building Code applies

Permit fees in Masset

Not published online — set by Village bylaw; confirm with the Village office. Confidence: partial.

Fees change and vary by project — confirm the current schedule with Village of Masset.

Worth knowing about Masset

Small Haida Gwaii village with thin online permit info — no dedicated building-permit page found; the Property Services page is water/sewer only. Applicants should phone the Village Office directly for forms, fees and procedure. Bylaws are listed at massetbc.com/residents/bylaws/.

Masset permit questions

Where do I submit a building permit application in Masset?

In person / email — no online permit portal. Village office handles applications directly. (No dedicated building-permit web page located; Property Services page covers only water/sewer/garbage.)

Who issues electrical and gas permits in Masset?

Technical Safety BC (province). Standard for a village this size — Masset has no delegated electrical/gas authority; electrical and gas-fitting permits go through Technical Safety BC.

How much does a building permit cost in Masset?

Not published online — set by Village bylaw; confirm with the Village office. Confidence: partial. Fees vary by project, so confirm the current schedule with Village of Masset before budgeting.

What do I need to apply for a building permit in Masset?

Village of Masset asks for: Building permits required prior to or concurrently with other approvals; not waived by other approvals; Application, drawings and fees handled through the Village Office (details not published online); Governed by Village building/zoning bylaws and the Integrated Official Community Plan (Masset2040 IOCP); BC Building Code applies.

Anything else to know about permits in Masset?

Small Haida Gwaii village with thin online permit info — no dedicated building-permit page found; the Property Services page is water/sewer only. Applicants should phone the Village Office directly for forms, fees and procedure. Bylaws are listed at massetbc.com/residents/bylaws/.

Sources

General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with Village of Masset before you build.

See what's being built in Masset

Construction Radar turns building-permit data into a live map of real construction jobs — who's building, what it's worth, and who to call.

Start for free