Village of Lions Bay
How to get a building permit in Lions Bay, BC
Where to apply, what Lions Bay asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.
Where to apply in Lions Bay
In person / online forms via lionsbay.ca or through the Village Office — no third-party portal named. Submit construction plans and supporting documentation to the Village Office.
Official Village of Lions Bay permit pageVillage Office — reception@lionsbay.ca, 604-921-9333, PO Box 141, 400 Centre Road, Lions Bay, BC V0N 2E0. Hours Mon–Fri 9a–4p.
Who issues electrical and gas permits
Technical Safety BC (standard for BC — Village issues building permits; electrical and gas are not municipally issued). No stated exception; not delegated.
- electrical
- Technical Safety BC
- gas
- Technical Safety BC
Step by step in Lions Bay
- 1
Confirm zoning before anything else
Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Lions Bay won't issue until land use is settled.
- 2
Work out which permits you need
Structural work needs a building permit from Village of Lions Bay. Electrical and gas are separate and are issued by Technical Safety BC (standard for BC — Village issues building permits; electrical and gas are not municipally issued). Plumbing is usually part of the building permit.
- 3
Prepare drawings and documents
Village of Lions Bay asks for: Construction plans and supporting documentation demonstrating compliance with applicable Codes, Regulations, Bylaws and property encumbrances; Permit must be obtained before commencing work; Agent Authorization Form for representatives acting on owner's behalf.
- 4
Submit your application
In person / online forms via lionsbay.ca or through the Village Office — no third-party portal named. Submit construction plans and supporting documentation to the Village Office.
- 5
Pay the permit fee
$100 application fee; building permit fees based on the value of construction. Additional charges/securities (Development Cost Charges, damage deposits) may be collected when the permit fee balance is due. Confirm the current schedule with Lions Bay before you budget.
- 6
Plan review, then build to inspections
The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.
What Lions Bay asks for
- Construction plans and supporting documentation demonstrating compliance with applicable Codes, Regulations, Bylaws and property encumbrances
- Permit must be obtained before commencing work
- Agent Authorization Form for representatives acting on owner's behalf
Permit fees in Lions Bay
$100 application fee; building permit fees based on the value of construction. Additional charges/securities (Development Cost Charges, damage deposits) may be collected when the permit fee balance is due.
Fees change and vary by project — confirm the current schedule with Village of Lions Bay.
Worth knowing about Lions Bay
Small North Shore village; steep terrain often means geotechnical/engineered drawings in practice. Building Bylaws page and Secondary Suites page provide additional detail. Forms available online or at the Village Office.
Lions Bay permit questions
Where do I submit a building permit application in Lions Bay?
In person / online forms via lionsbay.ca or through the Village Office — no third-party portal named. Submit construction plans and supporting documentation to the Village Office.
Who issues electrical and gas permits in Lions Bay?
Technical Safety BC (standard for BC — Village issues building permits; electrical and gas are not municipally issued). No stated exception; not delegated.
How much does a building permit cost in Lions Bay?
$100 application fee; building permit fees based on the value of construction. Additional charges/securities (Development Cost Charges, damage deposits) may be collected when the permit fee balance is due. Fees vary by project, so confirm the current schedule with Village of Lions Bay before budgeting.
What do I need to apply for a building permit in Lions Bay?
Village of Lions Bay asks for: Construction plans and supporting documentation demonstrating compliance with applicable Codes, Regulations, Bylaws and property encumbrances; Permit must be obtained before commencing work; Agent Authorization Form for representatives acting on owner's behalf.
Anything else to know about permits in Lions Bay?
Small North Shore village; steep terrain often means geotechnical/engineered drawings in practice. Building Bylaws page and Secondary Suites page provide additional detail. Forms available online or at the Village Office.
Sources
General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with Village of Lions Bay before you build.
See what's being built in Lions Bay
Construction Radar turns building-permit data into a live map of real construction jobs — who's building, what it's worth, and who to call.
Start for free