How to get a building permit in Kimberley, BC

Where to apply, what Kimberley asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.

Where to apply in Kimberley

In person / email — NO named online portal. Application forms obtained at City Hall during office hours or downloaded from the city document centre; electronic copies of drawings preferred. Building Official reachable by email/phone.

Official City of Kimberley permit page

City of Kimberley Building Official, 250-427-9655, building.official@kimberley.ca (City Hall, 340 Spokane Street, Kimberley BC V1A 2E8).

Who issues electrical and gas permits

Technical Safety BC — 'New or alterations to electrical and gas systems will require a permit from the Technical Safety BC.' The City does NOT issue these permits.

electrical
Technical Safety BC
gas
Technical Safety BC

Step by step in Kimberley

  1. 1

    Confirm zoning before anything else

    Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Kimberley won't issue until land use is settled.

  2. 2

    Work out which permits you need

    Structural work needs a building permit from City of Kimberley. Electrical and gas are separate and are issued by Technical Safety BC — 'New or alterations to electrical and gas systems will require a permit from the Technical Safety BC. Plumbing is usually part of the building permit.

  3. 3

    Prepare drawings and documents

    City of Kimberley asks for: Permit required for any new detached building/structure over 10 m2 (108 sq ft) and for structural repairs/alterations/additions including decks; One (1) set of construction blueprints/sketches with dimensions, foundation details, floor plans (showing use), elevations and structural section details (electronic copies preferred); Detailed plot plan showing location of proposed work and distances from all property lines; Proof of property ownership or owner authorization letter; BC Housing Certified New Home Registration form for new dwellings; BC Energy Step Code compliance for new residential construction; WorkSafeBC / asbestos clearance for demolition or renovation work; Engineered drawings (Schedule B professionals) for complex/engineered structures; Minor work (repainting, cabinets, like-for-like plumbing fixture swaps) does not require a permit.

  4. 4

    Submit your application

    In person / email — NO named online portal. Application forms obtained at City Hall during office hours or downloaded from the city document centre; electronic copies of drawings preferred. Building Official reachable by email/phone.

  5. 5

    Pay the permit fee

    Permit fees per Building Bylaw No. 2620, 2025 — value-of-construction based; fee due when the City is ready to issue. Complete applications generally assessed within 10 working days. Permits valid 2 years from issuance (renewable 1 year). Confirm the current schedule with Kimberley before you budget.

  6. 6

    Plan review, then build to inspections

    The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.

What Kimberley asks for

  • Permit required for any new detached building/structure over 10 m2 (108 sq ft) and for structural repairs/alterations/additions including decks
  • One (1) set of construction blueprints/sketches with dimensions, foundation details, floor plans (showing use), elevations and structural section details (electronic copies preferred)
  • Detailed plot plan showing location of proposed work and distances from all property lines
  • Proof of property ownership or owner authorization letter
  • BC Housing Certified New Home Registration form for new dwellings
  • BC Energy Step Code compliance for new residential construction
  • WorkSafeBC / asbestos clearance for demolition or renovation work
  • Engineered drawings (Schedule B professionals) for complex/engineered structures
  • Minor work (repainting, cabinets, like-for-like plumbing fixture swaps) does not require a permit

Permit fees in Kimberley

Permit fees per Building Bylaw No. 2620, 2025 — value-of-construction based; fee due when the City is ready to issue. Complete applications generally assessed within 10 working days. Permits valid 2 years from issuance (renewable 1 year).

Fees change and vary by project — confirm the current schedule with City of Kimberley.

Worth knowing about Kimberley

Kimberley runs its own building department (unlike the RDCK villages) and explicitly directs electrical and gas to Technical Safety BC. New Building Bylaw No. 2620, 2025 in force. Ten-working-day assessment target.

Kimberley permit questions

Where do I submit a building permit application in Kimberley?

In person / email — NO named online portal. Application forms obtained at City Hall during office hours or downloaded from the city document centre; electronic copies of drawings preferred. Building Official reachable by email/phone.

Who issues electrical and gas permits in Kimberley?

Technical Safety BC — 'New or alterations to electrical and gas systems will require a permit from the Technical Safety BC.' The City does NOT issue these permits.

How much does a building permit cost in Kimberley?

Permit fees per Building Bylaw No. 2620, 2025 — value-of-construction based; fee due when the City is ready to issue. Complete applications generally assessed within 10 working days. Permits valid 2 years from issuance (renewable 1 year). Fees vary by project, so confirm the current schedule with City of Kimberley before budgeting.

What do I need to apply for a building permit in Kimberley?

City of Kimberley asks for: Permit required for any new detached building/structure over 10 m2 (108 sq ft) and for structural repairs/alterations/additions including decks; One (1) set of construction blueprints/sketches with dimensions, foundation details, floor plans (showing use), elevations and structural section details (electronic copies preferred); Detailed plot plan showing location of proposed work and distances from all property lines; Proof of property ownership or owner authorization letter; BC Housing Certified New Home Registration form for new dwellings; BC Energy Step Code compliance for new residential construction; WorkSafeBC / asbestos clearance for demolition or renovation work; Engineered drawings (Schedule B professionals) for complex/engineered structures; Minor work (repainting, cabinets, like-for-like plumbing fixture swaps) does not require a permit.

Anything else to know about permits in Kimberley?

Kimberley runs its own building department (unlike the RDCK villages) and explicitly directs electrical and gas to Technical Safety BC. New Building Bylaw No. 2620, 2025 in force. Ten-working-day assessment target.

Sources

General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with City of Kimberley before you build.