How to get a building permit in Highlands, BC

Where to apply, what Highlands asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.

Where to apply in Highlands

In person / email (info@highlands.ca) / mail. No online portal.

Official District of Highlands permit page

Building Dept: 250-474-1773, info@highlands.ca, 1980 Millstream Road, Victoria (Highlands), BC V9B 6H1. Mon-Fri 8:30am-4:00pm.

Who issues electrical and gas permits

Technical Safety BC issues both electrical and gas permits (1-866-566-7233). Not handled by the District.

electrical
Technical Safety BC
gas
Technical Safety BC

Step by step in Highlands

  1. 1

    Confirm zoning before anything else

    Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Highlands won't issue until land use is settled.

  2. 2

    Work out which permits you need

    Structural work needs a building permit from District of Highlands. Electrical and gas are separate and are issued by Technical Safety BC issues both electrical and gas permits (1-866-566-7233). Plumbing is usually part of the building permit.

  3. 3

    Prepare drawings and documents

    District of Highlands asks for: Only complete applications with all required documents are accepted; Governed by Building Regulation Bylaw No. 192 and the BC Building Code (minimum requirements for safety, health, accessibility, fire, structural, energy and water efficiency); Permit required before constructing, repairing, altering, moving or demolishing any building or structure; no stage of work may start before permit issuance; Detailed document requirements (site plan, drawings, engineered drawings for complex work, septic approval) are listed on the application/checklist.

  4. 4

    Submit your application

    In person / email (info@highlands.ca) / mail. No online portal.

  5. 5

    Pay the permit fee

    Fees per District bylaw (not detailed on the building page); refer to Building Regulation Bylaw No. 192. Confirm the current schedule with Highlands before you budget.

  6. 6

    Plan review, then build to inspections

    The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.

What Highlands asks for

  • Only complete applications with all required documents are accepted
  • Governed by Building Regulation Bylaw No. 192 and the BC Building Code (minimum requirements for safety, health, accessibility, fire, structural, energy and water efficiency)
  • Permit required before constructing, repairing, altering, moving or demolishing any building or structure; no stage of work may start before permit issuance
  • Detailed document requirements (site plan, drawings, engineered drawings for complex work, septic approval) are listed on the application/checklist

Permit fees in Highlands

Fees per District bylaw (not detailed on the building page); refer to Building Regulation Bylaw No. 192.

Fees change and vary by project — confirm the current schedule with District of Highlands.

Permit types in Highlands

Building permit

The core municipal approval to legally construct, add to, or structurally alter a building, issued after plan review confirms compliance with the BC Building Code and local bylaws.

Plumbing permit

A trade permit (often issued separately from, or alongside, the building permit) authorizing installation, extension, or alteration of potable water, drainage-waste-vent, and connections to municipal water/sewer, verified against the BC Plumbing Code.

Worth knowing about Highlands

Small rural district (~2,500 pop). Broad range of land/environmental permits (soil, tree cutting, blasting) reflecting the forested terrain.

Highlands permit questions

Where do I submit a building permit application in Highlands?

In person / email (info@highlands.ca) / mail. No online portal.

Who issues electrical and gas permits in Highlands?

Technical Safety BC issues both electrical and gas permits (1-866-566-7233). Not handled by the District.

How much does a building permit cost in Highlands?

Fees per District bylaw (not detailed on the building page); refer to Building Regulation Bylaw No. 192. Fees vary by project, so confirm the current schedule with District of Highlands before budgeting.

What do I need to apply for a building permit in Highlands?

District of Highlands asks for: Only complete applications with all required documents are accepted; Governed by Building Regulation Bylaw No. 192 and the BC Building Code (minimum requirements for safety, health, accessibility, fire, structural, energy and water efficiency); Permit required before constructing, repairing, altering, moving or demolishing any building or structure; no stage of work may start before permit issuance; Detailed document requirements (site plan, drawings, engineered drawings for complex work, septic approval) are listed on the application/checklist.

Anything else to know about permits in Highlands?

Small rural district (~2,500 pop). Broad range of land/environmental permits (soil, tree cutting, blasting) reflecting the forested terrain.

Sources

General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with District of Highlands before you build.