Town of Golden
How to get a building permit in Golden, BC
Where to apply, what Golden asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.
Where to apply in Golden
In person / email — no online portal (no Cloudpermit/ProjectDox). Submit completed fillable PDF forms to building@golden.ca; in-person consultation available. (Note: cityofgolden.gov is Golden, COLORADO — not this Golden; use golden.ca only.)
Official Town of Golden permit pageDevelopment Services / Building: building@golden.ca; 250-344-2271. Town Hall: 810 9 Ave South, Golden, BC V0A 1H0. Hours Mon–Fri 9:00am–4:00pm.
Who issues electrical and gas permits
Technical Safety BC (province-wide authority) — the Town issues building and demolition permits only; electrical and gas permits go to Technical Safety BC, 1-866-566-7233.
- electrical
- Technical Safety BC
- gas
- Technical Safety BC
Step by step in Golden
- 1
Confirm zoning before anything else
Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Golden won't issue until land use is settled.
- 2
Work out which permits you need
Structural work needs a building permit from Town of Golden. Electrical and gas are separate and are issued by Technical Safety BC (province-wide authority) — the Town issues building and demolition permits only; electrical and gas permits go to Technical Safety BC, 1-866-566-7233. Plumbing is usually part of the building permit.
- 3
Prepare drawings and documents
Town of Golden asks for: Site plans and floor plans; Energy-modelled report by an Energy Advisor (BC Energy Step Code — adopted by the Town); Proof of air-tightness testing for Step Code compliance; Agent authorization where an agent applies; Certification of Plumbing Installation; Owner acknowledgement of sole reliance on registered professional (for professionally-designed work); Home warranty insurance for new homes (provincial requirement); engineered drawings for complex work.
- 4
Submit your application
In person / email — no online portal (no Cloudpermit/ProjectDox). Submit completed fillable PDF forms to building@golden.ca; in-person consultation available. (Note: cityofgolden.gov is Golden, COLORADO — not this Golden; use golden.ca only.)
- 5
Pay the permit fee
Fees per Town of Golden building bylaw (Bylaw No. 1214, 2007) — construction-value based; specific schedule not published on the permits page, contact Development Services. Confirm the current schedule with Golden before you budget.
- 6
Plan review, then build to inspections
The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.
What Golden asks for
- Site plans and floor plans
- Energy-modelled report by an Energy Advisor (BC Energy Step Code — adopted by the Town)
- Proof of air-tightness testing for Step Code compliance
- Agent authorization where an agent applies
- Certification of Plumbing Installation
- Owner acknowledgement of sole reliance on registered professional (for professionally-designed work)
- Home warranty insurance for new homes (provincial requirement); engineered drawings for complex work
Permit fees in Golden
Fees per Town of Golden building bylaw (Bylaw No. 1214, 2007) — construction-value based; specific schedule not published on the permits page, contact Development Services.
Fees change and vary by project — confirm the current schedule with Town of Golden.
Worth knowing about Golden
Town has formally adopted the BC Energy Step Code, so all new buildings must be energy-modelled by an Energy Advisor with the report and air-tightness testing included in the application. Governed by Zoning Bylaw 1294, 2011 and Building Bylaw 1214, 2007.
Golden permit questions
Where do I submit a building permit application in Golden?
In person / email — no online portal (no Cloudpermit/ProjectDox). Submit completed fillable PDF forms to building@golden.ca; in-person consultation available. (Note: cityofgolden.gov is Golden, COLORADO — not this Golden; use golden.ca only.)
Who issues electrical and gas permits in Golden?
Technical Safety BC (province-wide authority) — the Town issues building and demolition permits only; electrical and gas permits go to Technical Safety BC, 1-866-566-7233.
How much does a building permit cost in Golden?
Fees per Town of Golden building bylaw (Bylaw No. 1214, 2007) — construction-value based; specific schedule not published on the permits page, contact Development Services. Fees vary by project, so confirm the current schedule with Town of Golden before budgeting.
What do I need to apply for a building permit in Golden?
Town of Golden asks for: Site plans and floor plans; Energy-modelled report by an Energy Advisor (BC Energy Step Code — adopted by the Town); Proof of air-tightness testing for Step Code compliance; Agent authorization where an agent applies; Certification of Plumbing Installation; Owner acknowledgement of sole reliance on registered professional (for professionally-designed work); Home warranty insurance for new homes (provincial requirement); engineered drawings for complex work.
Anything else to know about permits in Golden?
Town has formally adopted the BC Energy Step Code, so all new buildings must be energy-modelled by an Energy Advisor with the report and air-tightness testing included in the application. Governed by Zoning Bylaw 1294, 2011 and Building Bylaw 1214, 2007.
Sources
General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with Town of Golden before you build.