District of Sechelt
How to get a building permit in Sechelt, BC
Where to apply, what Sechelt asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.
Where to apply in Sechelt
Cloudpermit — apply and track status anywhere; pay online through a secure payment portal. Inspections coordinated through the system.
Official District of Sechelt permit pageBuilding Department: 604-885-1986, building@sechelt.ca, 2nd Floor, 5797 Cowrie Street, PO Box 129, Sechelt, BC V0N 3A0.
Who issues electrical and gas permits
Technical Safety BC (provincial). Sechelt issues building/plumbing permits; electrical and gas permits go through Technical Safety BC (not delegated to the District).
- electrical
- Technical Safety BC
- gas
- Technical Safety BC
Step by step in Sechelt
- 1
Confirm zoning before anything else
Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Sechelt won't issue until land use is settled.
- 2
Work out which permits you need
Structural work needs a building permit from District of Sechelt. Electrical and gas are separate and are issued by Technical Safety BC (provincial). Plumbing is usually part of the building permit.
- 3
Prepare drawings and documents
District of Sechelt asks for: Cloudpermit application + documents; Site plan showing location on the lot (required even for accessory buildings <10 m2 for zoning conformance); Construction drawings; Compliance with the 2024 BC Building Code and updates; Engineered/sealed drawings for engineered structures; Photograph pre-existing damage to roads/curbs/sidewalks abutting the property before construction starts; BC Energy Step Code compliance for new Part 9 buildings.
- 4
Submit your application
Cloudpermit — apply and track status anywhere; pay online through a secure payment portal. Inspections coordinated through the system.
- 5
Pay the permit fee
Building fees per Schedule F of Fees and Charges Bylaw No. 575, 2019. Payable online via Cloudpermit secure portal. Confirm the current schedule with Sechelt before you budget.
- 6
Plan review, then build to inspections
The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.
What Sechelt asks for
- Cloudpermit application + documents
- Site plan showing location on the lot (required even for accessory buildings <10 m2 for zoning conformance)
- Construction drawings
- Compliance with the 2024 BC Building Code and updates
- Engineered/sealed drawings for engineered structures
- Photograph pre-existing damage to roads/curbs/sidewalks abutting the property before construction starts
- BC Energy Step Code compliance for new Part 9 buildings
Permit fees in Sechelt
Building fees per Schedule F of Fees and Charges Bylaw No. 575, 2019. Payable online via Cloudpermit secure portal.
Fees change and vary by project — confirm the current schedule with District of Sechelt.
Permit types in Sechelt
Plumbing permit
A trade permit (often issued separately from, or alongside, the building permit) authorizing installation, extension, or alteration of potable water, drainage-waste-vent, and connections to municipal water/sewer, verified against the BC Plumbing Code.
Demolition permit
A municipal permit to tear down or remove a building or structure, conditional on safe utility disconnections, a pre-demolition hazardous-materials (asbestos) survey and abatement, and — in many cities — recycling/deconstruction requirements backed by a refundable deposit.
Worth knowing about Sechelt
Permit required before ANY construction/renovation. Accessory buildings under 10 m2 may be exempt but still need a site-location plan for zoning conformance. Finishing/refinishing (paint, wallpaper, trim) exempt. Applies current 2024 BC Building Code.
Sechelt permit questions
Where do I submit a building permit application in Sechelt?
Cloudpermit — apply and track status anywhere; pay online through a secure payment portal. Inspections coordinated through the system.
Who issues electrical and gas permits in Sechelt?
Technical Safety BC (provincial). Sechelt issues building/plumbing permits; electrical and gas permits go through Technical Safety BC (not delegated to the District).
How much does a building permit cost in Sechelt?
Building fees per Schedule F of Fees and Charges Bylaw No. 575, 2019. Payable online via Cloudpermit secure portal. Fees vary by project, so confirm the current schedule with District of Sechelt before budgeting.
What do I need to apply for a building permit in Sechelt?
District of Sechelt asks for: Cloudpermit application + documents; Site plan showing location on the lot (required even for accessory buildings <10 m2 for zoning conformance); Construction drawings; Compliance with the 2024 BC Building Code and updates; Engineered/sealed drawings for engineered structures; Photograph pre-existing damage to roads/curbs/sidewalks abutting the property before construction starts; BC Energy Step Code compliance for new Part 9 buildings.
Anything else to know about permits in Sechelt?
Permit required before ANY construction/renovation. Accessory buildings under 10 m2 may be exempt but still need a site-location plan for zoning conformance. Finishing/refinishing (paint, wallpaper, trim) exempt. Applies current 2024 BC Building Code.
Sources
General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with District of Sechelt before you build.