Where to apply in Kent
In person / email — submit applications to building@kentbc.ca (no Cloudpermit-style online portal found; District office at 7170 Cheam Ave)
Official District of Kent (Agassiz) permit pageBuilding Department: 604-796-2235, building@kentbc.ca, Box 70, 7170 Cheam Avenue, Agassiz, BC V0M 1A0. Hours Mon-Fri 8:30am-4:30pm. After-hours emergencies 1-866-951-3718.
Who issues electrical and gas permits
Technical Safety BC (provincial). Kent is not a delegated electrical/gas authority; the District only requires proof that electrical, natural-gas/propane and other trade contractors hold a valid Kent business licence and trade certification.
- electrical
- Technical Safety BC
- gas
- Technical Safety BC
Step by step in Kent
- 1
Confirm zoning before anything else
Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Kent won't issue until land use is settled.
- 2
Work out which permits you need
Structural work needs a building permit from District of Kent (Agassiz). Electrical and gas are separate and are issued by Technical Safety BC (provincial). Plumbing is usually part of the building permit.
- 3
Prepare drawings and documents
District of Kent (Agassiz) asks for: Building Permit Application form completed; Site plan and construction drawings; Letter of Agency if applying on behalf of the owner; Sub-contractor business licence + trade certification for each trade (electrical, plumbing, gas, sprinkler, insulation, solid-fuel); BC Energy Step Code compliance for new Part 9 buildings; Engineered/sealed drawings for engineered structures; As of Jan 1 2024, asbestos-abatement contractors must be licensed in BC (relevant to demolition/renovation).
- 4
Submit your application
In person / email — submit applications to building@kentbc.ca (no Cloudpermit-style online portal found; District office at 7170 Cheam Ave)
- 5
Pay the permit fee
Set by the District of Kent building bylaw fee schedule; not published on the permit page — confirm with the building department. Confirm the current schedule with Kent before you budget.
- 6
Plan review, then build to inspections
The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.
What Kent asks for
- Building Permit Application form completed
- Site plan and construction drawings
- Letter of Agency if applying on behalf of the owner
- Sub-contractor business licence + trade certification for each trade (electrical, plumbing, gas, sprinkler, insulation, solid-fuel)
- BC Energy Step Code compliance for new Part 9 buildings
- Engineered/sealed drawings for engineered structures
- As of Jan 1 2024, asbestos-abatement contractors must be licensed in BC (relevant to demolition/renovation)
Permit fees in Kent
Set by the District of Kent building bylaw fee schedule; not published on the permit page — confirm with the building department.
Fees change and vary by project — confirm the current schedule with District of Kent (Agassiz).
Permit types in Kent
Demolition permit
A municipal permit to tear down or remove a building or structure, conditional on safe utility disconnections, a pre-demolition hazardous-materials (asbestos) survey and abatement, and — in many cities — recycling/deconstruction requirements backed by a refundable deposit.
Worth knowing about Kent
Application is email/in-person driven rather than a hosted online portal. Emphasis on verifying every trade contractor holds a valid Kent business licence and certification before permit issuance.
Kent permit questions
Where do I submit a building permit application in Kent?
In person / email — submit applications to building@kentbc.ca (no Cloudpermit-style online portal found; District office at 7170 Cheam Ave)
Who issues electrical and gas permits in Kent?
Technical Safety BC (provincial). Kent is not a delegated electrical/gas authority; the District only requires proof that electrical, natural-gas/propane and other trade contractors hold a valid Kent business licence and trade certification.
How much does a building permit cost in Kent?
Set by the District of Kent building bylaw fee schedule; not published on the permit page — confirm with the building department. Fees vary by project, so confirm the current schedule with District of Kent (Agassiz) before budgeting.
What do I need to apply for a building permit in Kent?
District of Kent (Agassiz) asks for: Building Permit Application form completed; Site plan and construction drawings; Letter of Agency if applying on behalf of the owner; Sub-contractor business licence + trade certification for each trade (electrical, plumbing, gas, sprinkler, insulation, solid-fuel); BC Energy Step Code compliance for new Part 9 buildings; Engineered/sealed drawings for engineered structures; As of Jan 1 2024, asbestos-abatement contractors must be licensed in BC (relevant to demolition/renovation).
Anything else to know about permits in Kent?
Application is email/in-person driven rather than a hosted online portal. Emphasis on verifying every trade contractor holds a valid Kent business licence and certification before permit issuance.
Sources
General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with District of Kent (Agassiz) before you build.
See what's being built in Kent
Construction Radar turns building-permit data into a live map of real construction jobs — who's building, what it's worth, and who to call.
Start for free