How to get a building permit in Delta, BC

Where to apply, what Delta asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.

Where to apply in Delta

TWO online portals, mandatory two-step process (paper/email applications no longer accepted): (1) 'Delta Online' eApply/Prospero — https://deltaonline.ca (complete the application form + pay the application fee); (2) 'ePlan' portal — upload required drawings then click 'Submit for Review'. Application is only reviewed once BOTH steps are complete. Inspections booked via 'eInspections' (up to 5 days ahead) on deltaonline.ca.

Official Corporation of Delta (City of Delta) permit page

Application Centre / Development Department: 604-946-3380; development@delta.ca. Portal: deltaonline.ca.

Who issues electrical and gas permits

Technical Safety BC — Delta states administration of safety standards for electrical, gas, boiler and other technical equipment is delegated to Technical Safety BC. Contractors apply to TSBC for electrical/gas; at FRAMING inspection Delta requires documentation confirming those TSBC permits were issued. (Delta itself issues plumbing permits.)

electrical
Technical Safety BC
Sending this to Corporation of Delta (City of Delta) instead won't get forwarded — it starts over. On a service upgrade that also pushes out your BC Hydro reconnect, usually the longest lead time on the whole job.
gas
Technical Safety BC
Sending this to Corporation of Delta (City of Delta) instead won't get forwarded — it starts over, and gas work can't be inspected or turned on until the right authority has issued the permit.

Step by step in Delta

  1. 1

    Confirm zoning before anything else

    Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Delta won't issue until land use is settled.

  2. 2

    Work out which permits you need

    Structural work needs a building permit from Corporation of Delta (City of Delta). Electrical and gas are separate and are issued by Technical Safety BC — Delta states administration of safety standards for electrical, gas, boiler and other technical equipment is delegated to Technical Safety BC. Plumbing is usually part of the building permit.

  3. 3

    Prepare drawings and documents

    Corporation of Delta (City of Delta) asks for: Two-step online submission: Delta Online application + fee, then ePlan drawing upload (submissions must be digital; registered-professional seals in digital format with verification embedded in the documents); Drawings scaled to scope (site plan, floor plans, elevations, sections); requirements 'dependent on the scope and nature of the proposal'; Site plan with existing/proposed buildings and setbacks; BC Energy Step Code: Part 9 homes must meet STEP 3; all new/substantially-reconstructed dwellings require energy modelling by a certified Energy Advisor with the application, and an As-Built Step Code compliance report at Final/Occupancy; New-home warranty: enrol with BC Housing or qualify for an exemption before starting a new home; Owner authorization / Letter of Authorization for Strata Properties where applicable; Registered professional Letters of Assurance (Schedule B) for complex/engineered work; Geotechnical report for hillside / slope-instability development permit areas; engineered SEAWALL (structural engineer) for Boundary Bay shorefront properties; Contaminated Site Profile and Fraser Health approvals where triggered; Electrical & gas permits from Technical Safety BC (proof required at framing inspection).

  4. 4

    Submit your application

    TWO online portals, mandatory two-step process (paper/email applications no longer accepted): (1) 'Delta Online' eApply/Prospero — https://deltaonline.ca (complete the application form + pay the application fee); (2) 'ePlan' portal — upload required drawings then click 'Submit for Review'. Application is only reviewed once BOTH steps are complete. Inspections booked via 'eInspections' (up to 5 days ahead) on deltaonline.ca.

  5. 5

    Pay the permit fee

    Varies by permit type/scope; fee-payment request and instructions sent after the application is received. Building permit = plan-processing fee + building permit fee (scales with construction value). Plumbing fees calculated by number of fixtures and whether fire-sprinkler/hydrant/hot-water-heating systems are involved. Demolition permit approx. flat fee (~$153). Confirm the current schedule with Delta before you budget.

  6. 6

    Plan review, then build to inspections

    The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.

What Delta asks for

  • Two-step online submission: Delta Online application + fee, then ePlan drawing upload (submissions must be digital; registered-professional seals in digital format with verification embedded in the documents)
  • Drawings scaled to scope (site plan, floor plans, elevations, sections); requirements 'dependent on the scope and nature of the proposal'
  • Site plan with existing/proposed buildings and setbacks
  • BC Energy Step Code: Part 9 homes must meet STEP 3; all new/substantially-reconstructed dwellings require energy modelling by a certified Energy Advisor with the application, and an As-Built Step Code compliance report at Final/Occupancy
  • New-home warranty: enrol with BC Housing or qualify for an exemption before starting a new home
  • Owner authorization / Letter of Authorization for Strata Properties where applicable
  • Registered professional Letters of Assurance (Schedule B) for complex/engineered work
  • Geotechnical report for hillside / slope-instability development permit areas; engineered SEAWALL (structural engineer) for Boundary Bay shorefront properties
  • Contaminated Site Profile and Fraser Health approvals where triggered
  • Electrical & gas permits from Technical Safety BC (proof required at framing inspection)

Permit fees in Delta

Varies by permit type/scope; fee-payment request and instructions sent after the application is received. Building permit = plan-processing fee + building permit fee (scales with construction value). Plumbing fees calculated by number of fixtures and whether fire-sprinkler/hydrant/hot-water-heating systems are involved. Demolition permit approx. flat fee (~$153).

Fees change and vary by project — confirm the current schedule with Corporation of Delta (City of Delta).

Delta permit forms

Open a form here and fill it in without leaving the page.

Pick a form to open it here.

Permit types in Delta

Plumbing permit

A trade permit (often issued separately from, or alongside, the building permit) authorizing installation, extension, or alteration of potable water, drainage-waste-vent, and connections to municipal water/sewer, verified against the BC Plumbing Code.

Worth knowing about Delta

Fully digital, two-portal workflow (Delta Online + ePlan) — no paper/email. GEOTECHNICAL requirements for designated slope-instability development permit areas and engineered SEAWALL requirements for Boundary Bay shorefront are Delta-specific. Step Code Step 3 mandatory for Part 9 with mandatory Energy Advisor modelling. Development Permit may be required before building permit. Contaminated Site Profile / Fraser Health approvals can be triggers.

Delta permit questions

Where do I submit a building permit application in Delta?

TWO online portals, mandatory two-step process (paper/email applications no longer accepted): (1) 'Delta Online' eApply/Prospero — https://deltaonline.ca (complete the application form + pay the application fee); (2) 'ePlan' portal — upload required drawings then click 'Submit for Review'. Application is only reviewed once BOTH steps are complete. Inspections booked via 'eInspections' (up to 5 days ahead) on deltaonline.ca.

Who issues electrical and gas permits in Delta?

Technical Safety BC — Delta states administration of safety standards for electrical, gas, boiler and other technical equipment is delegated to Technical Safety BC. Contractors apply to TSBC for electrical/gas; at FRAMING inspection Delta requires documentation confirming those TSBC permits were issued. (Delta itself issues plumbing permits.)

How much does a building permit cost in Delta?

Varies by permit type/scope; fee-payment request and instructions sent after the application is received. Building permit = plan-processing fee + building permit fee (scales with construction value). Plumbing fees calculated by number of fixtures and whether fire-sprinkler/hydrant/hot-water-heating systems are involved. Demolition permit approx. flat fee (~$153). Fees vary by project, so confirm the current schedule with Corporation of Delta (City of Delta) before budgeting.

What do I need to apply for a building permit in Delta?

Corporation of Delta (City of Delta) asks for: Two-step online submission: Delta Online application + fee, then ePlan drawing upload (submissions must be digital; registered-professional seals in digital format with verification embedded in the documents); Drawings scaled to scope (site plan, floor plans, elevations, sections); requirements 'dependent on the scope and nature of the proposal'; Site plan with existing/proposed buildings and setbacks; BC Energy Step Code: Part 9 homes must meet STEP 3; all new/substantially-reconstructed dwellings require energy modelling by a certified Energy Advisor with the application, and an As-Built Step Code compliance report at Final/Occupancy; New-home warranty: enrol with BC Housing or qualify for an exemption before starting a new home; Owner authorization / Letter of Authorization for Strata Properties where applicable; Registered professional Letters of Assurance (Schedule B) for complex/engineered work; Geotechnical report for hillside / slope-instability development permit areas; engineered SEAWALL (structural engineer) for Boundary Bay shorefront properties; Contaminated Site Profile and Fraser Health approvals where triggered; Electrical & gas permits from Technical Safety BC (proof required at framing inspection).

Anything else to know about permits in Delta?

Fully digital, two-portal workflow (Delta Online + ePlan) — no paper/email. GEOTECHNICAL requirements for designated slope-instability development permit areas and engineered SEAWALL requirements for Boundary Bay shorefront are Delta-specific. Step Code Step 3 mandatory for Part 9 with mandatory Energy Advisor modelling. Development Permit may be required before building permit. Contaminated Site Profile / Fraser Health approvals can be triggers.

Sources

General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with Corporation of Delta (City of Delta) before you build.