Skip to content
All BC permit guides

Village of Cumberland

How to get a building permit in Cumberland, BC

Where to apply, what Cumberland asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.

Where to apply in Cumberland

In person / email — applications submitted in person at the Village Office (2673 Dunsmuir Ave), Mon–Fri 9am–4pm; no online permit portal

Official Village of Cumberland permit page

Building/Planning — 250-336-2291, planning@cumberland.ca (general info@cumberland.ca), 2673 Dunsmuir Ave / Box 340, Cumberland BC V0R 1S0; Mon–Fri 9am–4pm

Who issues electrical and gas permits

Technical Safety BC — the Village explicitly does NOT issue electrical or gas permits and directs applicants to Technical Safety BC

electrical
Technical Safety BC
gas
Technical Safety BC

Step by step in Cumberland

  1. 1

    Confirm zoning before anything else

    Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Cumberland won't issue until land use is settled.

  2. 2

    Work out which permits you need

    Structural work needs a building permit from Village of Cumberland. Electrical and gas are separate and are issued by Technical Safety BC — the Village explicitly does NOT issue electrical or gas permits and directs applicants to Technical Safety BC. Plumbing is usually part of the building permit.

  3. 3

    Prepare drawings and documents

    Village of Cumberland asks for: Applications submitted in person at Village Office (no online portal); Must comply with BC Building Code (BCBC) — provincial regulation applies in Cumberland; Non-refundable building permit processing fee due at submission; Permit fee + damage deposit due after approval; Inspections booked ≥48 hrs in advance; typically Tuesdays and Thursdays — call 250-336-2291 or email info@cumberland.ca; Hazardous Materials Declaration required (notably for demolitions/alterations).

  4. 4

    Submit your application

    In person / email — applications submitted in person at the Village Office (2673 Dunsmuir Ave), Mon–Fri 9am–4pm; no online permit portal

  5. 5

    Pay the permit fee

    Construction value estimated using the Marshall & Swift Valuation Service; non-refundable processing fee at submission, then permit fee + damage deposit on approval. Governed by Building Bylaw No. 949, 2012. Confirm the current schedule with Cumberland before you budget.

  6. 6

    Plan review, then build to inspections

    The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.

What Cumberland asks for

  • Applications submitted in person at Village Office (no online portal)
  • Must comply with BC Building Code (BCBC) — provincial regulation applies in Cumberland
  • Non-refundable building permit processing fee due at submission
  • Permit fee + damage deposit due after approval
  • Inspections booked ≥48 hrs in advance; typically Tuesdays and Thursdays — call 250-336-2291 or email info@cumberland.ca
  • Hazardous Materials Declaration required (notably for demolitions/alterations)

Permit fees in Cumberland

Construction value estimated using the Marshall & Swift Valuation Service; non-refundable processing fee at submission, then permit fee + damage deposit on approval. Governed by Building Bylaw No. 949, 2012.

Fees change and vary by project — confirm the current schedule with Village of Cumberland.

Permit types in Cumberland

Plumbing permit

A trade permit (often issued separately from, or alongside, the building permit) authorizing installation, extension, or alteration of potable water, drainage-waste-vent, and connections to municipal water/sewer, verified against the BC Plumbing Code.

Demolition permit

A municipal permit to tear down or remove a building or structure, conditional on safe utility disconnections, a pre-demolition hazardous-materials (asbestos) survey and abatement, and — in many cities — recycling/deconstruction requirements backed by a refundable deposit.

Worth knowing about Cumberland

Small village, in-person intake only. Explicitly issues its own building + plumbing permits but sends electrical/gas to Technical Safety BC. Uses Marshall & Swift to value construction. Governed by Building Bylaw No. 949, 2012.

Cumberland permit questions

Where do I submit a building permit application in Cumberland?

In person / email — applications submitted in person at the Village Office (2673 Dunsmuir Ave), Mon–Fri 9am–4pm; no online permit portal

Who issues electrical and gas permits in Cumberland?

Technical Safety BC — the Village explicitly does NOT issue electrical or gas permits and directs applicants to Technical Safety BC

How much does a building permit cost in Cumberland?

Construction value estimated using the Marshall & Swift Valuation Service; non-refundable processing fee at submission, then permit fee + damage deposit on approval. Governed by Building Bylaw No. 949, 2012. Fees vary by project, so confirm the current schedule with Village of Cumberland before budgeting.

What do I need to apply for a building permit in Cumberland?

Village of Cumberland asks for: Applications submitted in person at Village Office (no online portal); Must comply with BC Building Code (BCBC) — provincial regulation applies in Cumberland; Non-refundable building permit processing fee due at submission; Permit fee + damage deposit due after approval; Inspections booked ≥48 hrs in advance; typically Tuesdays and Thursdays — call 250-336-2291 or email info@cumberland.ca; Hazardous Materials Declaration required (notably for demolitions/alterations).

Anything else to know about permits in Cumberland?

Small village, in-person intake only. Explicitly issues its own building + plumbing permits but sends electrical/gas to Technical Safety BC. Uses Marshall & Swift to value construction. Governed by Building Bylaw No. 949, 2012.

Sources

General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with Village of Cumberland before you build.

See what's being built in Cumberland

Construction Radar turns building-permit data into a live map of real construction jobs — who's building, what it's worth, and who to call.

Start for free