Skip to content
All BC permit guides

City of Courtenay

How to get a building permit in Courtenay, BC

Where to apply, what Courtenay asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.

Where to apply in Courtenay

Online-only via the City's digital 'Apply for a building permit' smart form on courtenay.ca (custom online submission portal; no in-person or email applications accepted). A downloadable PDF application (building@courtenay.ca) also exists as backup.

Official City of Courtenay permit page

Development Services / Building Division 250-334-4441 (or 250-703-4862); building@courtenay.ca; 830 Cliffe Avenue, Courtenay, BC V9N 2J7; Mon-Fri 8:30am-4:30pm

Who issues electrical and gas permits

Technical Safety BC (province-wide issuer for electrical & gas permits; the City does not issue these)

electrical
Technical Safety BC
Sending this to City of Courtenay instead won't get forwarded — it starts over. On a service upgrade that also pushes out your BC Hydro reconnect, usually the longest lead time on the whole job.
gas
Technical Safety BC
Sending this to City of Courtenay instead won't get forwarded — it starts over, and gas work can't be inspected or turned on until the right authority has issued the permit.

Step by step in Courtenay

  1. 1

    Confirm zoning before anything else

    Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Courtenay won't issue until land use is settled.

  2. 2

    Work out which permits you need

    Structural work needs a building permit from City of Courtenay. Electrical and gas are separate and are issued by Technical Safety BC (province-wide issuer for electrical & gas permits; the City does not issue these). Plumbing is usually part of the building permit.

  3. 3

    Prepare drawings and documents

    City of Courtenay asks for: All applications submitted digitally; processed only once all required components received and reviewed by a building official; Site plans showing final proposed elevations at the four main corners of the building (new residential/commercial); Construction fire safety plan for large commercial, industrial and multi-family developments; Stand-alone plumbing permits must show fixture locations; BC Building Code 2024 compliance — new adaptable-dwelling and seismic requirements effective March 10, 2025; Inspections required (footing forms, drain tile/damp-proofing, services, final).

  4. 4

    Submit your application

    Online-only via the City's digital 'Apply for a building permit' smart form on courtenay.ca (custom online submission portal; no in-person or email applications accepted). A downloadable PDF application (building@courtenay.ca) also exists as backup.

  5. 5

    Pay the permit fee

    Permit fees and associated costs calculated by staff, due upon permit issuance (no fixed schedule published on page; construction-value based). Governed by Courtenay Building Bylaw. Confirm the current schedule with Courtenay before you budget.

  6. 6

    Plan review, then build to inspections

    The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.

What Courtenay asks for

  • All applications submitted digitally; processed only once all required components received and reviewed by a building official
  • Site plans showing final proposed elevations at the four main corners of the building (new residential/commercial)
  • Construction fire safety plan for large commercial, industrial and multi-family developments
  • Stand-alone plumbing permits must show fixture locations
  • BC Building Code 2024 compliance — new adaptable-dwelling and seismic requirements effective March 10, 2025
  • Inspections required (footing forms, drain tile/damp-proofing, services, final)

Permit fees in Courtenay

Permit fees and associated costs calculated by staff, due upon permit issuance (no fixed schedule published on page; construction-value based). Governed by Courtenay Building Bylaw.

Fees change and vary by project — confirm the current schedule with City of Courtenay.

Worth knowing about Courtenay

Most digitally advanced of the five — fully online, no in-person applications. Adopted BC Building Code 2024 with adaptable-dwelling + updated seismic design standards effective March 10, 2025 for applications on/after that date. Development Services line 250-703-4862.

Courtenay permit questions

Where do I submit a building permit application in Courtenay?

Online-only via the City's digital 'Apply for a building permit' smart form on courtenay.ca (custom online submission portal; no in-person or email applications accepted). A downloadable PDF application (building@courtenay.ca) also exists as backup.

Who issues electrical and gas permits in Courtenay?

Technical Safety BC (province-wide issuer for electrical & gas permits; the City does not issue these)

How much does a building permit cost in Courtenay?

Permit fees and associated costs calculated by staff, due upon permit issuance (no fixed schedule published on page; construction-value based). Governed by Courtenay Building Bylaw. Fees vary by project, so confirm the current schedule with City of Courtenay before budgeting.

What do I need to apply for a building permit in Courtenay?

City of Courtenay asks for: All applications submitted digitally; processed only once all required components received and reviewed by a building official; Site plans showing final proposed elevations at the four main corners of the building (new residential/commercial); Construction fire safety plan for large commercial, industrial and multi-family developments; Stand-alone plumbing permits must show fixture locations; BC Building Code 2024 compliance — new adaptable-dwelling and seismic requirements effective March 10, 2025; Inspections required (footing forms, drain tile/damp-proofing, services, final).

Anything else to know about permits in Courtenay?

Most digitally advanced of the five — fully online, no in-person applications. Adopted BC Building Code 2024 with adaptable-dwelling + updated seismic design standards effective March 10, 2025 for applications on/after that date. Development Services line 250-703-4862.

Sources

General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with City of Courtenay before you build.

See what's being built in Courtenay

Construction Radar turns building-permit data into a live map of real construction jobs — who's building, what it's worth, and who to call.

Start for free