Skip to content
All BC permit guides

City of Courtenay

How to get a building permit in Courtenay, BC

Where to apply, what Courtenay asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.

Where to apply in Courtenay

Online-only via the City's digital 'Apply for a building permit' smart form on courtenay.ca (custom online submission portal; no in-person or email applications accepted). A downloadable PDF application (building@courtenay.ca) also exists as backup.

Official City of Courtenay permit page

Development Services / Building Division 250-334-4441 (or 250-703-4862); building@courtenay.ca; 830 Cliffe Avenue, Courtenay, BC V9N 2J7; Mon-Fri 8:30am-4:30pm

Who issues electrical and gas permits

Technical Safety BC (province-wide issuer for electrical & gas permits; the City does not issue these)

electrical
Technical Safety BC
gas
Technical Safety BC

Step by step in Courtenay

  1. 1

    Confirm zoning before anything else

    Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Courtenay won't issue until land use is settled.

  2. 2

    Work out which permits you need

    Structural work needs a building permit from City of Courtenay. Electrical and gas are separate and are issued by Technical Safety BC (province-wide issuer for electrical & gas permits; the City does not issue these). Plumbing is usually part of the building permit.

  3. 3

    Prepare drawings and documents

    City of Courtenay asks for: All applications submitted digitally; processed only once all required components received and reviewed by a building official; Site plans showing final proposed elevations at the four main corners of the building (new residential/commercial); Construction fire safety plan for large commercial, industrial and multi-family developments; Stand-alone plumbing permits must show fixture locations; BC Building Code 2024 compliance — new adaptable-dwelling and seismic requirements effective March 10, 2025; Inspections required (footing forms, drain tile/damp-proofing, services, final).

  4. 4

    Submit your application

    Online-only via the City's digital 'Apply for a building permit' smart form on courtenay.ca (custom online submission portal; no in-person or email applications accepted). A downloadable PDF application (building@courtenay.ca) also exists as backup.

  5. 5

    Pay the permit fee

    Permit fees and associated costs calculated by staff, due upon permit issuance (no fixed schedule published on page; construction-value based). Governed by Courtenay Building Bylaw. Confirm the current schedule with Courtenay before you budget.

  6. 6

    Plan review, then build to inspections

    The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.

What Courtenay asks for

  • All applications submitted digitally; processed only once all required components received and reviewed by a building official
  • Site plans showing final proposed elevations at the four main corners of the building (new residential/commercial)
  • Construction fire safety plan for large commercial, industrial and multi-family developments
  • Stand-alone plumbing permits must show fixture locations
  • BC Building Code 2024 compliance — new adaptable-dwelling and seismic requirements effective March 10, 2025
  • Inspections required (footing forms, drain tile/damp-proofing, services, final)

Permit fees in Courtenay

Permit fees and associated costs calculated by staff, due upon permit issuance (no fixed schedule published on page; construction-value based). Governed by Courtenay Building Bylaw.

Fees change and vary by project — confirm the current schedule with City of Courtenay.

Worth knowing about Courtenay

Most digitally advanced of the five — fully online, no in-person applications. Adopted BC Building Code 2024 with adaptable-dwelling + updated seismic design standards effective March 10, 2025 for applications on/after that date. Development Services line 250-703-4862.

Courtenay permit questions

Where do I submit a building permit application in Courtenay?

Online-only via the City's digital 'Apply for a building permit' smart form on courtenay.ca (custom online submission portal; no in-person or email applications accepted). A downloadable PDF application (building@courtenay.ca) also exists as backup.

Who issues electrical and gas permits in Courtenay?

Technical Safety BC (province-wide issuer for electrical & gas permits; the City does not issue these)

How much does a building permit cost in Courtenay?

Permit fees and associated costs calculated by staff, due upon permit issuance (no fixed schedule published on page; construction-value based). Governed by Courtenay Building Bylaw. Fees vary by project, so confirm the current schedule with City of Courtenay before budgeting.

What do I need to apply for a building permit in Courtenay?

City of Courtenay asks for: All applications submitted digitally; processed only once all required components received and reviewed by a building official; Site plans showing final proposed elevations at the four main corners of the building (new residential/commercial); Construction fire safety plan for large commercial, industrial and multi-family developments; Stand-alone plumbing permits must show fixture locations; BC Building Code 2024 compliance — new adaptable-dwelling and seismic requirements effective March 10, 2025; Inspections required (footing forms, drain tile/damp-proofing, services, final).

Anything else to know about permits in Courtenay?

Most digitally advanced of the five — fully online, no in-person applications. Adopted BC Building Code 2024 with adaptable-dwelling + updated seismic design standards effective March 10, 2025 for applications on/after that date. Development Services line 250-703-4862.

Sources

General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with City of Courtenay before you build.

See what's being built in Courtenay

Construction Radar turns building-permit data into a live map of real construction jobs — who's building, what it's worth, and who to call.

Start for free