Skip to content
All BC permit guides

Village of Chase

How to get a building permit in Chase, BC

Where to apply, what Chase asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.

Where to apply in Chase

In person / pick-up. The complete Building Permit Application Package is picked up from the Village office (826 Okanagan Ave). No online permitting portal — building inspection is provided by the Thompson-Nicola Regional District (TNRD) by appointment only (TNRD Building Inspector 250-377-8673).

Official Village of Chase permit page

Village of Chase, 826 Okanagan Avenue, Box 440, Chase, BC V0E 1M0 — 250-679-3238, chase@chasebc.ca (office 9am-4pm Mon-Fri). TNRD Building Inspector: 250-377-8673.

Who issues electrical and gas permits

Technical Safety BC — the Village page explicitly states electrical and gas permits are handled separately by Technical Safety BC.

electrical
Technical Safety BC
Sending this to Village of Chase instead won't get forwarded — it starts over. On a service upgrade that also pushes out your BC Hydro reconnect, usually the longest lead time on the whole job.
gas
Technical Safety BC
Sending this to Village of Chase instead won't get forwarded — it starts over, and gas work can't be inspected or turned on until the right authority has issued the permit.

Step by step in Chase

  1. 1

    Confirm zoning before anything else

    Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Chase won't issue until land use is settled.

  2. 2

    Work out which permits you need

    Structural work needs a building permit from Village of Chase. Electrical and gas are separate and are issued by Technical Safety BC — the Village page explicitly states electrical and gas permits are handled separately by Technical Safety BC. Plumbing is usually part of the building permit.

  3. 3

    Prepare drawings and documents

    Village of Chase asks for: Development Permit obtained first if required before Building Permit application; Building Permit must be issued prior to building, altering, demolishing or moving a building/structure; Complies with BC Building Code and Building Regulations Bylaw No. 803-2014; Site plan and construction drawings; Owner's Undertaking Letter; Registered Professional's Proof of Insurance for engineered work; BC Energy Step Code compliance for new Part 9 construction; New-home warranty via BC Housing for new dwellings (or qualifying exemption).

  4. 4

    Submit your application

    In person / pick-up. The complete Building Permit Application Package is picked up from the Village office (826 Okanagan Ave). No online permitting portal — building inspection is provided by the Thompson-Nicola Regional District (TNRD) by appointment only (TNRD Building Inspector 250-377-8673).

  5. 5

    Pay the permit fee

    Fees listed in Appendix 'A' of Building Regulations Bylaw No. 803-2014; Fees & Charges Bylaw No. 820-2016 also applies (typically construction-value based). Confirm the current schedule with Chase before you budget.

  6. 6

    Plan review, then build to inspections

    The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.

What Chase asks for

  • Development Permit obtained first if required before Building Permit application
  • Building Permit must be issued prior to building, altering, demolishing or moving a building/structure
  • Complies with BC Building Code and Building Regulations Bylaw No. 803-2014
  • Site plan and construction drawings
  • Owner's Undertaking Letter; Registered Professional's Proof of Insurance for engineered work
  • BC Energy Step Code compliance for new Part 9 construction
  • New-home warranty via BC Housing for new dwellings (or qualifying exemption)

Permit fees in Chase

Fees listed in Appendix 'A' of Building Regulations Bylaw No. 803-2014; Fees & Charges Bylaw No. 820-2016 also applies (typically construction-value based).

Fees change and vary by project — confirm the current schedule with Village of Chase.

Permit types in Chase

Building permit

The core municipal approval to legally construct, add to, or structurally alter a building, issued after plan review confirms compliance with the BC Building Code and local bylaws.

Plumbing permit

A trade permit (often issued separately from, or alongside, the building permit) authorizing installation, extension, or alteration of potable water, drainage-waste-vent, and connections to municipal water/sewer, verified against the BC Plumbing Code.

Worth knowing about Chase

Small village; building inspection outsourced to TNRD, by appointment only. Electrical & gas explicitly go through Technical Safety BC. Application is paper/in-person only.

Chase permit questions

Where do I submit a building permit application in Chase?

In person / pick-up. The complete Building Permit Application Package is picked up from the Village office (826 Okanagan Ave). No online permitting portal — building inspection is provided by the Thompson-Nicola Regional District (TNRD) by appointment only (TNRD Building Inspector 250-377-8673).

Who issues electrical and gas permits in Chase?

Technical Safety BC — the Village page explicitly states electrical and gas permits are handled separately by Technical Safety BC.

How much does a building permit cost in Chase?

Fees listed in Appendix 'A' of Building Regulations Bylaw No. 803-2014; Fees & Charges Bylaw No. 820-2016 also applies (typically construction-value based). Fees vary by project, so confirm the current schedule with Village of Chase before budgeting.

What do I need to apply for a building permit in Chase?

Village of Chase asks for: Development Permit obtained first if required before Building Permit application; Building Permit must be issued prior to building, altering, demolishing or moving a building/structure; Complies with BC Building Code and Building Regulations Bylaw No. 803-2014; Site plan and construction drawings; Owner's Undertaking Letter; Registered Professional's Proof of Insurance for engineered work; BC Energy Step Code compliance for new Part 9 construction; New-home warranty via BC Housing for new dwellings (or qualifying exemption).

Anything else to know about permits in Chase?

Small village; building inspection outsourced to TNRD, by appointment only. Electrical & gas explicitly go through Technical Safety BC. Application is paper/in-person only.

Sources

General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with Village of Chase before you build.

See what's being built in Chase

Construction Radar turns building-permit data into a live map of real construction jobs — who's building, what it's worth, and who to call.

Start for free