How to get a building permit in Campbell River, BC

Where to apply, what Campbell River asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.

Where to apply in Campbell River

MyCity portal (eservices.campbellriver.ca) for online services; building permit applications submitted by email (building@campbellriver.ca) or in person at City Hall — one combined Building Permit Application Form covers all project types

Official City of Campbell River permit page

Building Department — 250-286-5757, building@campbellriver.ca, City Hall 301 St Anns Rd, Campbell River BC V9W 4C7

Who issues electrical and gas permits

Technical Safety BC (province-wide authority; Campbell River is not one of the ~10 delegated municipalities, so electrical & gas permits go to TSBC)

electrical
Technical Safety BC
gas
Technical Safety BC

Step by step in Campbell River

  1. 1

    Confirm zoning before anything else

    Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Campbell River won't issue until land use is settled.

  2. 2

    Work out which permits you need

    Structural work needs a building permit from City of Campbell River. Electrical and gas are separate and are issued by Technical Safety BC (province-wide authority; Campbell River is not one of the ~10 delegated municipalities, so electrical & gas permits go to TSBC). Plumbing is usually part of the building permit.

  3. 3

    Prepare drawings and documents

    City of Campbell River asks for: Permit required for any structure over 108 sq ft (10 sq m); Check zoning (max area, height, lot coverage) before designing; Apply by emailing building@campbellriver.ca for a document-upload link, or in person at City Hall; Completed Building Permit Application Form with all contacts and signatures; Recent title search (dated no older than 14 days); Signed Damage to City Infrastructure Repair Agreement; Owner's Undertakings form; Site plans / drawings; engineered drawings for complex buildings; BC Energy Step Code documentation; Fire Department Checklist and Sub-Contractor List where applicable.

  4. 4

    Submit your application

    MyCity portal (eservices.campbellriver.ca) for online services; building permit applications submitted by email (building@campbellriver.ca) or in person at City Hall — one combined Building Permit Application Form covers all project types

  5. 5

    Pay the permit fee

    Fee schedule set by Building Bylaw (not detailed on the page); confirm current fees with the Building Dept. Confirm the current schedule with Campbell River before you budget.

  6. 6

    Plan review, then build to inspections

    The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.

What Campbell River asks for

  • Permit required for any structure over 108 sq ft (10 sq m)
  • Check zoning (max area, height, lot coverage) before designing
  • Apply by emailing building@campbellriver.ca for a document-upload link, or in person at City Hall
  • Completed Building Permit Application Form with all contacts and signatures
  • Recent title search (dated no older than 14 days)
  • Signed Damage to City Infrastructure Repair Agreement
  • Owner's Undertakings form
  • Site plans / drawings; engineered drawings for complex buildings
  • BC Energy Step Code documentation
  • Fire Department Checklist and Sub-Contractor List where applicable

Permit fees in Campbell River

Fee schedule set by Building Bylaw (not detailed on the page); confirm current fees with the Building Dept.

Fees change and vary by project — confirm the current schedule with City of Campbell River.

Permit types in Campbell River

Plumbing permit

A trade permit (often issued separately from, or alongside, the building permit) authorizing installation, extension, or alteration of potable water, drainage-waste-vent, and connections to municipal water/sewer, verified against the BC Plumbing Code.

Demolition permit

A municipal permit to tear down or remove a building or structure, conditional on safe utility disconnections, a pre-demolition hazardous-materials (asbestos) survey and abatement, and — in many cities — recycling/deconstruction requirements backed by a refundable deposit.

Worth knowing about Campbell River

Largest of the five — full digital application workflow (email for upload link) plus MyCity portal. Note the 14-day-fresh title search and mandatory Damage to City Infrastructure Repair Agreement. Inspections requested via building@campbellriver.ca.

Campbell River permit questions

Where do I submit a building permit application in Campbell River?

MyCity portal (eservices.campbellriver.ca) for online services; building permit applications submitted by email (building@campbellriver.ca) or in person at City Hall — one combined Building Permit Application Form covers all project types

Who issues electrical and gas permits in Campbell River?

Technical Safety BC (province-wide authority; Campbell River is not one of the ~10 delegated municipalities, so electrical & gas permits go to TSBC)

How much does a building permit cost in Campbell River?

Fee schedule set by Building Bylaw (not detailed on the page); confirm current fees with the Building Dept. Fees vary by project, so confirm the current schedule with City of Campbell River before budgeting.

What do I need to apply for a building permit in Campbell River?

City of Campbell River asks for: Permit required for any structure over 108 sq ft (10 sq m); Check zoning (max area, height, lot coverage) before designing; Apply by emailing building@campbellriver.ca for a document-upload link, or in person at City Hall; Completed Building Permit Application Form with all contacts and signatures; Recent title search (dated no older than 14 days); Signed Damage to City Infrastructure Repair Agreement; Owner's Undertakings form; Site plans / drawings; engineered drawings for complex buildings; BC Energy Step Code documentation; Fire Department Checklist and Sub-Contractor List where applicable.

Anything else to know about permits in Campbell River?

Largest of the five — full digital application workflow (email for upload link) plus MyCity portal. Note the 14-day-fresh title search and mandatory Damage to City Infrastructure Repair Agreement. Inspections requested via building@campbellriver.ca.

Sources

General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with City of Campbell River before you build.