How to get a building permit in Campbell River, BC

Where to apply, what Campbell River asks for, what it costs, and who issues electrical and gas permits — with links to the city's own forms.

Where to apply in Campbell River

MyCity portal (eservices.campbellriver.ca) for online services; building permit applications submitted by email (building@campbellriver.ca) or in person at City Hall — one combined Building Permit Application Form covers all project types

Official City of Campbell River permit page

Building Department — 250-286-5757, building@campbellriver.ca, City Hall 301 St Anns Rd, Campbell River BC V9W 4C7

Who issues electrical and gas permits

Technical Safety BC (province-wide authority; Campbell River is not one of the ~10 delegated municipalities, so electrical & gas permits go to TSBC)

electrical
Technical Safety BC
Sending this to City of Campbell River instead won't get forwarded — it starts over. On a service upgrade that also pushes out your BC Hydro reconnect, usually the longest lead time on the whole job.
gas
Technical Safety BC
Sending this to City of Campbell River instead won't get forwarded — it starts over, and gas work can't be inspected or turned on until the right authority has issued the permit.

Step by step in Campbell River

  1. 1

    Confirm zoning before anything else

    Check the property's zone, setbacks, height and lot coverage, and whether it sits in a Development Permit Area. If it does, that approval has to come before the building permit — Campbell River won't issue until land use is settled.

  2. 2

    Work out which permits you need

    Structural work needs a building permit from City of Campbell River. Electrical and gas are separate and are issued by Technical Safety BC (province-wide authority; Campbell River is not one of the ~10 delegated municipalities, so electrical & gas permits go to TSBC). Plumbing is usually part of the building permit.

  3. 3

    Prepare drawings and documents

    City of Campbell River asks for: Permit required for any structure over 108 sq ft (10 sq m); Check zoning (max area, height, lot coverage) before designing; Apply by emailing building@campbellriver.ca for a document-upload link, or in person at City Hall; Completed Building Permit Application Form with all contacts and signatures; Recent title search (dated no older than 14 days); Signed Damage to City Infrastructure Repair Agreement; Owner's Undertakings form; Site plans / drawings; engineered drawings for complex buildings; BC Energy Step Code documentation; Fire Department Checklist and Sub-Contractor List where applicable.

  4. 4

    Submit your application

    MyCity portal (eservices.campbellriver.ca) for online services; building permit applications submitted by email (building@campbellriver.ca) or in person at City Hall — one combined Building Permit Application Form covers all project types

  5. 5

    Pay the permit fee

    Fee schedule set by Building Bylaw (not detailed on the page); confirm current fees with the Building Dept. Confirm the current schedule with Campbell River before you budget.

  6. 6

    Plan review, then build to inspections

    The building department reviews against the BC Building Code and zoning; answer any comments quickly. Once issued, post the permit on site and book inspections at each stage — footings, framing, rough-in, insulation, final. Don't cover work before it's inspected.

What Campbell River asks for

  • Permit required for any structure over 108 sq ft (10 sq m)
  • Check zoning (max area, height, lot coverage) before designing
  • Apply by emailing building@campbellriver.ca for a document-upload link, or in person at City Hall
  • Completed Building Permit Application Form with all contacts and signatures
  • Recent title search (dated no older than 14 days)
  • Signed Damage to City Infrastructure Repair Agreement
  • Owner's Undertakings form
  • Site plans / drawings; engineered drawings for complex buildings
  • BC Energy Step Code documentation
  • Fire Department Checklist and Sub-Contractor List where applicable

Permit fees in Campbell River

Fee schedule set by Building Bylaw (not detailed on the page); confirm current fees with the Building Dept.

Fees change and vary by project — confirm the current schedule with City of Campbell River.

Permit types in Campbell River

Plumbing permit

A trade permit (often issued separately from, or alongside, the building permit) authorizing installation, extension, or alteration of potable water, drainage-waste-vent, and connections to municipal water/sewer, verified against the BC Plumbing Code.

Demolition permit

A municipal permit to tear down or remove a building or structure, conditional on safe utility disconnections, a pre-demolition hazardous-materials (asbestos) survey and abatement, and — in many cities — recycling/deconstruction requirements backed by a refundable deposit.

Worth knowing about Campbell River

Largest of the five — full digital application workflow (email for upload link) plus MyCity portal. Note the 14-day-fresh title search and mandatory Damage to City Infrastructure Repair Agreement. Inspections requested via building@campbellriver.ca.

Campbell River permit questions

Where do I submit a building permit application in Campbell River?

MyCity portal (eservices.campbellriver.ca) for online services; building permit applications submitted by email (building@campbellriver.ca) or in person at City Hall — one combined Building Permit Application Form covers all project types

Who issues electrical and gas permits in Campbell River?

Technical Safety BC (province-wide authority; Campbell River is not one of the ~10 delegated municipalities, so electrical & gas permits go to TSBC)

How much does a building permit cost in Campbell River?

Fee schedule set by Building Bylaw (not detailed on the page); confirm current fees with the Building Dept. Fees vary by project, so confirm the current schedule with City of Campbell River before budgeting.

What do I need to apply for a building permit in Campbell River?

City of Campbell River asks for: Permit required for any structure over 108 sq ft (10 sq m); Check zoning (max area, height, lot coverage) before designing; Apply by emailing building@campbellriver.ca for a document-upload link, or in person at City Hall; Completed Building Permit Application Form with all contacts and signatures; Recent title search (dated no older than 14 days); Signed Damage to City Infrastructure Repair Agreement; Owner's Undertakings form; Site plans / drawings; engineered drawings for complex buildings; BC Energy Step Code documentation; Fire Department Checklist and Sub-Contractor List where applicable.

Anything else to know about permits in Campbell River?

Largest of the five — full digital application workflow (email for upload link) plus MyCity portal. Note the 14-day-fresh title search and mandatory Damage to City Infrastructure Repair Agreement. Inspections requested via building@campbellriver.ca.

Sources

General information only, not legal or code advice. Requirements vary by project and change over time — always confirm what applies to your job with City of Campbell River before you build.